Kitchen-diner knock-throughs · Greenwich
Kitchen-diner knock-throughs in Greenwich
Kitchen-diner knock-throughs in Greenwich, from free survey to completion certificate.
- Price fixed in writing once scope is agreed
- Building control arranged
- Temporary works and making good included
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Kitchen-diner knock-throughs in Greenwich: how it works
If you live in Greenwich, kitchen-diner knock-throughs can usually be planned and priced after a single survey visit. Our coverage runs across London, so nearby villages are included too. We cover E14, SE3, SE4, SE7 and SE8, and we fix the price in writing once the layout and scope are agreed.
The wall between a kitchen and dining room is often a structural one, especially in semi-detached and terraced houses where it carries the floor joists for the bedrooms above. Opening it up gives the sociable, open-plan space most families want, but the kitchen brings extra things to plan: pipes, cables, an extractor, and a layout that has to work around the new steel.
Things to plan for
- If the kitchen also opens onto the hallway, the change can affect the escape route from the bedrooms. Building control checks how people would get out in a fire, and smoke alarms, a fire door or other measures may be required as part of approval.
- Sinks and dishwashers usually sit on an outside wall, but supply pipes and waste runs sometimes cross the internal wall. Moving the sink to an island means planning a waste route with enough fall under the floor, which affects how the floor is prepared.
- The structural work comes first, then first-fix electrics and plumbing, plastering, flooring and finally the kitchen fit. Booking the kitchen fitter only once the beam has passed inspection and the plaster has dried avoids units going onto damp walls.
- In many houses the kitchen and dining room wall carries the bedroom floor joists, and sometimes a bathroom wall above. Lifting a floorboard upstairs to see which way the joists run is a useful first look, though the engineer confirms what the wall actually supports.
- A gas hob or cooker supply often runs along or through the wall being removed. By law, any work on gas pipework must be carried out by a Gas Safe registered engineer, so the pipe is capped or rerouted by one before the wall comes down.
What happens, step by step
Survey in Greenwich
We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.
Engineer's design
A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Install and sign-off
Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.
How much should I budget in Greenwich?
As a guide, budget £3,200–£7,700 including VAT for kitchen-diner knock-through in Greenwich, based on published UK cost guides adjusted for London prices (+28%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Kitchen-diner knock-through | £3,200–£7,700 | Internal structural wall between kitchen and dining room, steel beam, approvals and making good (kitchen fitting extra) |
| Through-lounge knock-through | £3,200–£7,050 | Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill |
| Structural calculations for a beam | £320–£960 | Site measure or photos, beam and padstone design and calculations for building control |
| Fire protection to a steel beam | £190–£770 per beam | Fire-rated board boxing or an intumescent coating system as specified |
Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.
Building control and neighbours in Greenwich
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Kitchen-diner knock-throughs near Greenwich
- Blackheath 1.2 mi
- Catford 2.3 mi
- Peckham 2.5 mi
- Canning Town 2.8 mi
- Eltham 3.3 mi
- Bow 3.3 mi
Questions about kitchen-diner knock-throughs in Greenwich
Do I need a party wall agreement for kitchen-diner knock-throughs in Greenwich?
Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.
Do you also work near Greenwich?
Yes. We also cover nearby towns including Blackheath, Catford, Peckham and Canning Town.
What does a kitchen-diner knock-through quote include?
Our written quote is itemised: survey, engineer's calculations, building control, propping, removal of the wall, steel and padstones, fire protection, floor levelling and making good, with any gas, plumbing or electrical rerouting listed separately. Once the layout, specification and scope are agreed, the price is fixed in writing.
Should I do the knock-through before or after fitting a new kitchen?
Before. The steel, any column, the floor levelling and the plastering all need to be finished first, so the kitchen fitter works in a dry, square room with services already in position. Fitting units and then taking out a wall risks damage and rework, and the beam position can affect where wall units go.
Can I knock my kitchen and dining room into one?
In most houses, yes. The wall can be removed even if it is load-bearing, as long as a steel beam designed by a structural engineer takes over the load and building control approves the work. The main things to check early are what the wall carries, where services run, and whether the layout still works around any column.
Do you cover Greenwich for kitchen-diner knock-throughs?
Yes. We carry out kitchen-diner knock-throughs in Greenwich and the E14, SE3, SE4, SE7 and SE8 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.