How a steel beam job works

Eight stages from your first enquiry to the completion certificate, with one team throughout.

  1. Enquiry

    Tell us what you want to open up, where, and roughly how wide. A few photos of the wall, the ceiling either side and the room above help us prepare.

  2. Survey visit

    We check whether the wall is load-bearing, what it carries, the floor and foundations either side, services in the wall, and how steel can be delivered and lifted in. There is no charge for the visit.

  3. Calculations

    A qualified structural engineer designs the beam, padstones and any posts or foundations, and sets out the temporary support. You can use your own engineer if you prefer.

  4. Fixed written quote

    You receive an itemised quote covering calculations, approval fees, temporary works, steel, labour, fire protection and making good. The price is fixed in writing once the layout, specification and scope are agreed.

  5. Approvals and notices

    We submit the building notice or full plans application (England), the building control application under the Welsh regulations (Wales), the building warrant (Scotland) or the council application (Northern Ireland), and arrange party wall notices through a surveyor where needed in England and Wales.

  6. Installation

    Props and needles go in, the opening is formed in stages, padstones are bedded, and the steel is lifted in and packed tight before the props are removed.

  7. Inspection

    Building control inspects the steel and bearings before anything is covered. Any comments are dealt with straight away.

  8. Making good and sign-off

    We fire protect and box the steel, plaster, infill the floor and leave the room ready to decorate. The completion certificate follows the final inspection.

What we need from you

  • Access to the rooms either side of the wall and the room above
  • Rooms cleared of furniture where possible
  • Any consents only you can give or obtain, such as freeholder or landlord consent for flats, or listed building consent
  • A decision on the finish: beam boxed below the ceiling, set flush, or left exposed

Who is responsible for what

For domestic work, your client duties under the Construction (Design and Management) Regulations 2015 and the building regulations dutyholder rules pass to us as the contractor, or to the principal contractor if there is more than one. In Wales, from 1 July 2026, a domestic client can choose to take on some of those duties by signed statement; most leave them with the contractor.

Get your free survey

Tell us about the wall or opening. We reply to arrange a survey visit.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.

Questions and answers

Do I need a structural engineer to put in a steel beam?

Yes. Building control needs calculations showing the beam, padstones and any columns will carry the loads. A structural engineer produces them from the survey. We arrange this as part of the job, or work to calculations you already have.

Do I need building regulations approval to remove a load-bearing wall?

Yes, in every part of the UK. In England it needs building regulations approval through a building notice or full plans application. In Wales it needs an application to building control under the Welsh regulations, which changed on 1 July 2026. Scotland requires a building warrant before work starts, and in Northern Ireland the council's building control must approve it. We handle the application.

How long does a steel beam installation take?

The structural part of a typical internal wall removal takes two to five working days on site: propping, removing the wall, fitting and packing the steel. Plastering and drying follow. Calculations, approvals and any party wall notice period come before that and are planned into the timetable.