What kitchen-diner knock-throughs involve in Bow
Bow has a mix of housing, and kitchen-diner knock-throughs need a slightly different approach in each. We also cover the surrounding towns and villages in London. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.
The wall between a kitchen and dining room is often a structural one, especially in semi-detached and terraced houses where it carries the floor joists for the bedrooms above. Opening it up gives the sociable, open-plan space most families want, but the kitchen brings extra things to plan: pipes, cables, an extractor, and a layout that has to work around the new steel.
Worth knowing before you start
- Keep the structural calculations, the building control completion certificate and any gas or electrical certificates together. When the house is sold, the buyer's solicitor will usually ask for evidence that the knock-through was approved and signed off.
- Older kitchens can hide asbestos in textured ceiling coatings, floor tiles, boxing around pipes or the backing of old heaters. In buildings from before 2000 it must be identified before the fabric is disturbed, so a survey of the affected area is arranged first.
- The structural work comes first, then first-fix electrics and plumbing, plastering, flooring and finally the kitchen fit. Booking the kitchen fitter only once the beam has passed inspection and the plaster has dried avoids units going onto damp walls.
- Settle the kitchen layout before the steel is designed. If the engineer needs a column or a deeper beam, it is far easier to plan an island, tall units or the hob position around it at drawing stage than after the units are ordered.
- Sinks and dishwashers usually sit on an outside wall, but supply pipes and waste runs sometimes cross the internal wall. Moving the sink to an island means planning a waste route with enough fall under the floor, which affects how the floor is prepared.
What happens, step by step
Survey in Bow
We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.
Engineer's design
A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Install and sign-off
Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.
Guide prices for kitchen-diner knock-throughs in Bow
As a guide, budget £3,200–£7,700 including VAT for kitchen-diner knock-through in Bow, based on published UK cost guides adjusted for London prices (+28%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Kitchen-diner knock-through | £3,200–£7,700 | Internal structural wall between kitchen and dining room, steel beam, approvals and making good (kitchen fitting extra) |
| Load-bearing wall removal with steel beam | £2,550–£6,400 | Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good |
| Plastering and making good | £380–£1,540 | Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up |
| Fire protection to a steel beam | £190–£770 per beam | Fire-rated board boxing or an intumescent coating system as specified |
Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.
Building rules for Bow
For Bow, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Kitchen-diner knock-throughs near Bow
- Stratford 0.9 mi
- Canning Town 1.8 mi
- Leytonstone 3.1 mi
- Greenwich 3.3 mi
- Islington 3.8 mi
- Stamford Hill 3.8 mi
Questions about kitchen-diner knock-throughs in Bow
Do you also work near Bow?
Yes. We also cover nearby towns including Stratford, Canning Town, Leytonstone and Greenwich.
Do you cover Bow for kitchen-diner knock-throughs?
Yes. We carry out kitchen-diner knock-throughs in Bow and the E1, E2, E3, E9 and E13 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.
Do I need permission from my landlord or freeholder to open up a kitchen?
If you own a leasehold flat, usually yes. The lease will normally require the freeholder's or landlord's written consent for structural alterations, so get that before any work is booked. Freehold houses do not need this, and planning permission is not normally needed for internal changes unless the building is listed.
How long will I be without a kitchen?
The structural work itself usually takes three to six working days, and the kitchen is out of action during that time. After that come plastering, drying, flooring and the kitchen fit, so the overall period without a finished kitchen depends mostly on your fitter's programme and when the units are delivered.
Do I need building regulations for a kitchen-diner knock-through?
Yes, if the wall is structural. In England it needs building regulations approval through a full plans application or a building notice, in Wales an application under the Welsh regulations, and electrics and any change to fire escape routes are checked too. Scotland requires a building warrant before work starts, and Northern Ireland requires an application to council building control. We handle the application or notice.