Steel BeamInstallers
Finished open-plan kitchen diner with a plastered boxed beam across the ceiling

Kitchen-diner knock-throughs · Canning Town

Kitchen-diner knock-throughs in Canning Town

Kitchen-diner knock-throughs in Canning Town, from free survey to completion certificate.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Canning Town and nearby

Free survey in Canning Town

Tell us about the kitchen-diner knock-through job in Canning Town.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our kitchen-diner knock-throughs service in Canning Town

For homes in Canning Town and the E3, E6, E7, E13 and E14 districts, we handle kitchen-diner knock-throughs from survey to sign-off. The wider London area is covered as well. The beam is sized by a structural engineer and inspected before it is boxed in.

We plan the structural work alongside your kitchen design so the beam, any column and the services all land in the right place before units are ordered. A survey visit, engineer's calculations, building control, propping, the steel and making good are all covered in one itemised written quote, with the price fixed in writing once the layout and specification are agreed.

Worth knowing before you start

  • Cooker hood ducting that currently runs out through the wall may need a new route once the wall goes. Ducting can often be run in the ceiling void alongside the beam, but the beam's position and depth need to be known first.
  • In many houses the kitchen and dining room wall carries the bedroom floor joists, and sometimes a bathroom wall above. Lifting a floorboard upstairs to see which way the joists run is a useful first look, though the engineer confirms what the wall actually supports.
  • Keep the structural calculations, the building control completion certificate and any gas or electrical certificates together. When the house is sold, the buyer's solicitor will usually ask for evidence that the knock-through was approved and signed off.
  • Where the wall stood there is usually a strip of footing or a change in floor level between the two rooms. It is levelled with screed or timber so one continuous floor finish, such as tiles or engineered boards, can run straight across.
  • A gas hob or cooker supply often runs along or through the wall being removed. By law, any work on gas pipework must be carried out by a Gas Safe registered engineer, so the pipe is capped or rerouted by one before the wall comes down.

Four stages, one team

  1. Free visit

    A short visit to Canning Town to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

What do kitchen-diner knock-throughs cost in Canning Town?

As a guide, budget £3,200–£7,700 including VAT for kitchen-diner knock-through in Canning Town, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Kitchen-diner knock-through£3,200–£7,700Internal structural wall between kitchen and dining room, steel beam, approvals and making good (kitchen fitting extra)
Steel column or post£640–£1,920 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Fire protection to a steel beam£190–£770 per beamFire-rated board boxing or an intumescent coating system as specified
Structural calculations for a beam£320–£960Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Building rules for Canning Town

For Canning Town, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Kitchen-diner knock-throughs near Canning Town

Questions about kitchen-diner knock-throughs in Canning Town

How much do kitchen-diner knock-throughs cost in Canning Town?

As a guide, budget £3,200–£7,700 including VAT for kitchen-diner knock-through in Canning Town, based on published UK cost guides adjusted for London prices (+28%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

Do I need a party wall agreement for kitchen-diner knock-throughs in Canning Town?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Do I need permission from my landlord or freeholder to open up a kitchen?

If you own a leasehold flat, usually yes. The lease will normally require the freeholder's or landlord's written consent for structural alterations, so get that before any work is booked. Freehold houses do not need this, and planning permission is not normally needed for internal changes unless the building is listed.

Can I knock my kitchen and dining room into one?

In most houses, yes. The wall can be removed even if it is load-bearing, as long as a steel beam designed by a structural engineer takes over the load and building control approves the work. The main things to check early are what the wall carries, where services run, and whether the layout still works around any column.

Can I have a kitchen island where the wall used to be?

Often you can, but it depends on whether the engineer needs a column and where the beam ends bear. If an island is part of the plan, tell us at the survey so the steel can be designed around it. Plumbing or power to an island also needs a route under the floor.

What happens at the survey visit in Canning Town?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.