About our plastering & making good service in Greenwich
Need plastering & making good in Greenwich? The wider London area is covered as well. We survey the property, arrange the engineer's design, deal with local building control, fit the steel and make good, all under one quote for E14, SE3, SE4, SE7 and SE8 addresses.
Structural work leaves a trail behind it: a steel beam to hide, ragged wall ends, a strip of missing floor, cracked ceiling where props stood and holes where needles passed through. However good the steel, this is the part you look at every day, so it deserves the same care as the structure.
Things to plan for
- Fresh plaster has to dry before it is painted. A thin skim over board in a warm, ventilated room often dries within a few days to a week, while backing coats and deeper repairs take longer. Painting too soon can cause peeling and patchy colour.
- Period cornicing and ceiling roses can often be repaired or run to match the existing profile. Where a wall is removed between two rooms with cornice, the ends are usually returned neatly along the new beam so the detail looks intentional.
- Making good is easy to underestimate when budgeting. Removing a wall disturbs the ceiling, both wall ends and the floor, and props and needles leave their own marks, so the finishing work usually covers far more than the opening itself.
- When a wall is removed, a strip of floor goes with it. On suspended timber floors the gap is joisted and boarded, and on solid floors it is filled and screeded. Either way, the infill must sit level so new flooring does not show a ridge.
- Making good is the last chance to route cables neatly before surfaces close up. Sockets, switches and lights moved for the new layout are first-fixed before boarding, and pipes crossing the old wall line can run within the floor infill.
What happens, step by step
Free visit
A short visit to Greenwich to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
Guide prices for plastering & making good in Greenwich
As a guide, budget £380–£1,540 including VAT for plastering and making good in Greenwich, based on published UK cost guides adjusted for London prices (+28%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Plastering and making good | £380–£1,540 | Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up |
| Load-bearing wall removal with steel beam | £2,550–£6,400 | Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good |
| Chimney breast removal (ground floor) | £1,900–£3,850 | Ground-floor breast removed, steel to support the breast above, building control and making good |
| Through-lounge knock-through | £3,200–£7,050 | Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill |
Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.
Building control and neighbours in Greenwich
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Plastering & making good near Greenwich
- Blackheath 1.2 mi
- Catford 2.3 mi
- Peckham 2.5 mi
- Canning Town 2.8 mi
- Eltham 3.3 mi
- Bow 3.3 mi
Local questions answered
Can you work on older or listed homes in Greenwich?
Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.
Do you cover Greenwich for plastering & making good?
Yes. We carry out plastering & making good in Greenwich and the E14, SE3, SE4, SE7 and SE8 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.
Will cracks appear after plastering?
Small hairline cracks can appear in the first months as the plaster dries and the building settles onto the new steel. They are cosmetic and normal, and are usually filled when you next repaint. Wide or growing cracks are different and should be reported, as they can point to movement that needs checking.
How long after a knock-through can I decorate?
Once the new plaster has dried right through, which for a thin skim in a warm, ventilated room is often a few days to a week. Deeper repairs and backing coats take longer. Plaster turns from dark to an even pale colour when it is dry, and painting before then risks poor adhesion.
Can you match my old textured ceiling?
Often, yes, although a perfect match is hard over large patches. Before anything is touched, a textured coating applied before 2000 is tested for asbestos. Small areas can then be re-textured to blend in, while many people choose to skim the whole ceiling flat for a cleaner, consistent finish.
Do I need a party wall agreement for plastering & making good in Greenwich?
Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.