Steel BeamInstallers
Steel beam half boxed in pink fire-rated plasterboard

Fire protection for steel beams · Bognor Regis

Fire protection for steel beams in Bognor Regis

Fire protection for steel beams for homes in PO21, PO22, designed by a structural engineer.

  • Free survey visit in Bognor Regis
  • Engineer's calculations arranged
  • Building control handled for you

Free survey in Bognor Regis

Tell us about the fire protection for steel beams job in Bognor Regis.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Fire protection for steel beams in Bognor Regis: how it works

If you live in Bognor Regis, fire protection for steel beams can usually be planned and priced after a single survey visit. Bognor Regis is around 13.5 miles from Worthing, and we cover both. We cover PO21 and PO22, and we fix the price in writing once the layout and scope are agreed.

We fit fire protection alongside new steelwork, and as a standalone job where steel was installed without it or building control has asked for more. That covers boxing with fire-rated plasterboard, intumescent coatings for steel left on show, and the records building control needs to see before signing the work off.

What to expect

  • Older homes sometimes have steel fitted decades ago with no protection at all, or boxed in ordinary timber and hardboard. When this turns up during other work, we can check what is there and price protection to suit today's requirements.
  • Boxing a single beam usually takes around a day, plus skimming and drying. Intumescent coatings need each coat to dry before the next goes on, so they can take several days depending on the thickness required and the room temperature.
  • The fire resistance needed depends on the building and where the steel sits. In a typical two-storey house, elements of structure commonly need 30 minutes, but taller homes, flats and commercial premises can need more. The engineer and building control confirm the figure.
  • Exposed steel is popular in open-plan kitchens and loft spaces. An intumescent system can take a decorative top coat in most colours, although up close the finish has a slightly textured look compared with steel painted in a factory.
  • Fire-rated plasterboard is denser than standard board and contains additives that slow the passage of heat. It usually has a pink or red face, and the number of layers and fixing pattern come from the system specification rather than being decided on site.

How the job runs in Bognor Regis

  1. Free visit

    A short visit to Bognor Regis to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

What does fire protection for steel beams cost in Bognor Regis?

As a guide, budget £170–£670 per beam including VAT for fire protection to a steel beam in Bognor Regis, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Fire protection to a steel beam£170–£670 per beamFire-rated board boxing or an intumescent coating system as specified
Steel beam replacement£2,250–£6,150Propping, removing the failed beam, new steel on proper bearings, approval and making good
Steel column or post£560–£1,680 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Plastering and making good£340–£1,340Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building control and neighbours in Bognor Regis

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Fire protection for steel beams near Bognor Regis

Questions about fire protection for steel beams in Bognor Regis

Can you work on older or listed homes in Bognor Regis?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Do you also work near Bognor Regis?

Yes. We also cover nearby towns including Chichester, Littlehampton, Worthing and Havant.

Will building control check the fire protection on my beam?

Yes. Building control looks at fire protection as part of the structural work, normally at or before the final inspection. For boxing they may want to see the board before it is skimmed, and for coatings they may ask for the product details and thickness readings. We keep these records ready for them.

How long does intumescent paint take to apply?

Several days in most cases. Each coat has to dry before the next is applied, and the number of coats depends on the thickness needed. Cold or damp rooms slow drying, so the space is kept warm and ventilated, and the top coat goes on once the full build has been measured.

Does a steel beam in a house need fire protection?

Usually, yes. Where a steel beam or column holds up part of the structure, building regulations normally require it to resist fire for a set period, commonly 30 minutes in a typical house. Building control confirms what is needed for your property, and the protection is checked before the work is signed off.

Planning to take a wall out?