Steel BeamInstallers
Steel beam half boxed in pink fire-rated plasterboard

Fire protection for steel beams · West Sussex

Fire protection for steel beams in West Sussex

Survey, engineer's design and installation of fire protection for steel beams anywhere in West Sussex.

  • Free survey visit in West Sussex
  • Engineer's calculations arranged
  • Building control handled for you

Free survey in West Sussex

Tell us about your fire protection for steel beams project in West Sussex.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our fire protection for steel beams service in West Sussex

Fire protection for steel beams is the layer of fire-rated board or intumescent coating applied to structural steel so it keeps its strength long enough in a fire for people to get out. Steel softens as it heats, so building regulations set a period of fire resistance for beams and columns, and the protection is chosen and applied to meet that period.

We carry out fire protection for steel beams throughout West Sussex, for homeowners, landlords and builders who need the structural part done properly. Coverage takes in Worthing, Horsham and Haywards Heath and everywhere in between. You get an itemised written quote that shows the calculations, approvals, steel, labour and finishing as separate lines.

Worth knowing before you start

  • Boarding is fairly clean work, but coatings need a clean, dry and well-ventilated room at a suitable temperature. Dust from other trades can spoil the surface, so painting is normally scheduled once the messy work in that room is finished.
  • Exposed steel is popular in open-plan kitchens and loft spaces. An intumescent system can take a decorative top coat in most colours, although up close the finish has a slightly textured look compared with steel painted in a factory.
  • Steel does not burn, but it loses stiffness and strength as it heats. Protection is there to keep the temperature of the beam down for a set period, so the floor or walls it carries stay up while people leave.
  • Intumescent paint looks like an ordinary coating but swells into a thick insulating char when heated. How well it performs depends on the dry film thickness, which varies with the steel section and fire period, so it is applied to a written specification.
  • Boxing a single beam usually takes around a day, plus skimming and drying. Intumescent coatings need each coat to dry before the next goes on, so they can take several days depending on the thickness required and the room temperature.

Four stages, one team

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

How much should I budget in West Sussex?

As a guide, budget £170–£670 per beam including VAT for fire protection to a steel beam in West Sussex, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Fire protection to a steel beam£170–£670 per beamFire-rated board boxing or an intumescent coating system as specified
RSJ supply and fit (single beam)£900–£2,800 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Steel column or post£560–£1,680 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Structural calculations for a beam£280–£840Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building rules for West Sussex

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Local questions answered

What happens at the survey visit in West Sussex?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Which towns in West Sussex do you cover?

We cover towns including Crawley, Worthing, Bognor Regis and Littlehampton, plus the villages and smaller towns around them.

Can I put downlights in a boxed-in steel beam?

Only with planning. Cutting holes in fire boarding can weaken its protection, so any lights in or near the boxing need to be designed in, using fire-rated fittings or suitable fire-stopping where the board is pierced. It is far easier to sort this out before the boxing goes up than to adapt it afterwards.

Will building control check the fire protection on my beam?

Yes. Building control looks at fire protection as part of the structural work, normally at or before the final inspection. For boxing they may want to see the board before it is skimmed, and for coatings they may ask for the product details and thickness readings. We keep these records ready for them.

How long does intumescent paint take to apply?

Several days in most cases. Each coat has to dry before the next is applied, and the number of coats depends on the thickness needed. Cold or damp rooms slow drying, so the space is kept warm and ventilated, and the top coat goes on once the full build has been measured.

What is intumescent paint for steel beams?

Intumescent paint is a fire-protective coating that swells when heated, forming a thick insulating layer that slows the steel heating up. It lets you leave a beam on show while still meeting fire requirements. It must be applied at a specified thickness over a compatible primer, so it goes on to a written specification rather than like ordinary paint.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.