Steel BeamInstallers
Victorian through-lounge with a boxed beam where the dividing wall used to be

Through-lounge knock-throughs · Felling

Through-lounge knock-throughs in Felling

Through-lounge knock-throughs for homes in NE8, NE9, NE10, designed by a structural engineer.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Felling and nearby

Free survey in Felling

Tell us about the through-lounge knock-through job in Felling.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Through-lounge knock-throughs in Felling: how it works

Our through-lounge knock-throughs service in Felling covers everything from the first visit to the completion paperwork. We also work in nearby Newcastle upon Tyne, roughly 2.2 miles away. Postcode districts we cover here include NE8, NE9, NE10 and NE11.

We plan the steel so the opening suits the room's proportions and keeps period features where you want them, from chimney breasts to cornicing. The survey visit, calculations from a qualified structural engineer, building control, party wall notices through a party wall surveyor where needed, propping, steel and making good are all set out in one itemised written quote.

What to expect

  • Period ceilings are often lath and plaster, which can crack or sag when the wall below is disturbed. Props are set to spread load gently, and damaged areas are repaired with lime plaster or overboarded, depending on the condition and your preference.
  • If the house is listed, internal structural alterations need listed building consent as well as building regulations approval. Conservation area status does not usually affect internal work, but flats within converted period houses normally need the freeholder's consent.
  • Cutting a pocket into a party wall for a beam end is notifiable work under the Party Wall etc. Act 1996 in England and Wales. Your neighbour can agree or dissent, and a dissent means party wall surveyors must set out how the work is done before it starts.
  • The structural stage for a through-lounge typically takes three to five working days. Both reception rooms are out of use for that time, so furniture is moved out or stacked and sheeted, and the hallway is kept clear as the main walkway.
  • Chimney breasts on the party wall in each room often sit close to the dividing wall. The beam may need to bear near them or avoid them, so the engineer checks how the breasts and flues relate to the new bearing before the opening width is fixed.

Four stages, one team

  1. Survey in Felling

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to Gateshead Council, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

What do through-lounge knock-throughs cost in Felling?

As a guide, budget £2,300–£5,100 including VAT for through-lounge knock-through in Felling, based on published UK cost guides adjusted for prices in the North East (-7%).

JobTypical guide rangeWhat it usually covers
Through-lounge knock-through£2,300–£5,100Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill
Plastering and making good£280–£1,120Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
Party wall surveyor (agreed surveyor, per neighbour)£840–£1,860 per neighbourSchedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only)
Temporary works and propping£140–£460Props, spreaders, needles and sole plates for a typical opening, installed and struck

Figures include our approximate regional adjustment for prices in the North East (-7%) and are rounded. How these figures are worked out.

Approvals in Felling

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Gateshead Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Through-lounge knock-throughs near Felling

Questions about through-lounge knock-throughs in Felling

How soon can through-lounge knock-throughs start in Felling?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Do you also work near Felling?

Yes. We also cover nearby towns including Gateshead, Newcastle upon Tyne, Hebburn and Wallsend.

Do I need consent to knock through in a listed building?

Yes, you need both listed building consent and building regulations approval. Listed building consent from the local planning authority covers internal structural changes to the building's fabric, and building control covers the structural safety. Carrying out works to a listed building without consent is an offence, so it must be in place before anything is booked.

Will the ceiling crack when the wall is removed?

Some minor cracking in old lath and plaster ceilings is possible, even with careful propping, because the structure is being disturbed. We prop to spread the load and protect ceilings where we can, and any cracks are filled or repaired as part of making good. Sound plaster normally stays intact.

Can I knock my front and back rooms into one?

Yes, in most houses. The dividing wall is usually load-bearing, so a structural engineer designs a steel beam to carry the floor and wall above, and building control approves the work. In terraces and semis the beam often bears into the party wall, which in England and Wales means serving a party wall notice before work starts.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.