Load-bearing wall removal · Felling
Load-bearing wall removal in Felling
Load-bearing wall removal for homes in NE8, NE9, NE10, designed by a structural engineer.
- Itemised written quote
- Beam sized by a structural engineer
- Covering Felling and nearby
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Planning load-bearing wall removal in Felling
We carry out load-bearing wall removal in Felling, covering the NE8, NE9, NE10 and NE11 postcode districts. It sits about 2.2 miles from Newcastle upon Tyne, which we also cover. The job starts with a free survey visit so the engineer's calculations are based on your actual walls, floors and loads.
Most homes built before the 1970s have at least one internal wall that carries the floor joists, a wall upstairs or part of the roof. Taking it out is very doable, but the weight it carries has to go somewhere. A steel beam picks that load up and passes it down through padstones into walls or columns that can take it.
Worth knowing before you start
- Building control is needed because removing a structural wall is controlled building work. Doing it without approval can cause problems when you come to sell, and putting it right afterwards costs far more than doing it properly first time.
- Whether a wall is load-bearing is not always obvious. Joists running across the wall, a wall directly above, or the wall sitting on a footing in the floor are common clues, but the engineer's check on site is what settles it.
- Each end of the beam needs a solid bearing. Padstones spread the point load into the masonry below, and if the wall underneath is weak the engineer may call for a steel column or a new pad foundation instead.
- Cables, pipes, radiators and sometimes gas runs pass through internal walls. These are traced at the survey so they can be rerouted by the right trade before or during the work, not discovered halfway through.
- The beam size depends on the span, what sits above and how the ends are supported. Two walls that look the same can need very different steel, which is why every beam is sized from calculations rather than guessed.
From survey to sign-off in Felling
Free visit
A short visit to Felling to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to Gateshead Council, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
Guide prices for load-bearing wall removal in Felling
As a guide, budget £1,850–£4,650 including VAT for load-bearing wall removal with steel beam in Felling, based on published UK cost guides adjusted for prices in the North East (-7%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Load-bearing wall removal with steel beam | £1,850–£4,650 | Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good |
| Building control fees | £230–£600 | Building notice or full plans fee and inspections; varies by council or approver |
| Temporary works and propping | £140–£460 | Props, spreaders, needles and sole plates for a typical opening, installed and struck |
| RSJ supply and fit (single beam) | £740–£2,320 per beam | Beam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately) |
Figures include our approximate regional adjustment for prices in the North East (-7%) and are rounded. How these figures are worked out.
Building rules for Felling
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Gateshead Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Local questions answered
How soon can load-bearing wall removal start in Felling?
Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.
What happens at the survey visit in Felling?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.
Is a steel beam better than a concrete lintel?
For short openings in some walls a lintel can be enough, but wide openings carrying floors or walls above normally need steel. The engineer chooses whatever does the job properly. Steel is common because it carries a lot of load for its depth.
How do I know if my wall is load-bearing?
Clues include floor joists that run across the top of the wall, a wall directly above it upstairs, and a wall that is solid brick or block rather than a hollow stud partition. None of these is proof on its own. A structural engineer checks on site and confirms it before any work is planned.
What does the price include?
Our written quote is itemised, so you can see the calculations, building control fees, propping, steel, padstones, labour, fire protection and making good set out line by line. The price is fixed in writing once the layout and scope are agreed.