
Kitchen-diner knock-throughs · Felling
Kitchen-diner knock-throughs in Felling
Kitchen-diner knock-throughs in Felling, from free survey to completion certificate.
- Price fixed in writing once scope is agreed
- Building control arranged
- Temporary works and making good included
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Kitchen-diner knock-throughs in Felling: how it works
We cover kitchen-diner knock-throughs in Felling (NE8, NE9, NE10) and the streets around it. Felling is around 2.2 miles from Newcastle upon Tyne, and we cover both. Each job is designed by a structural engineer and approved through Gateshead Council before work begins.
The wall between a kitchen and dining room is often a structural one, especially in semi-detached and terraced houses where it carries the floor joists for the bedrooms above. Opening it up gives the sociable, open-plan space most families want, but the kitchen brings extra things to plan: pipes, cables, an extractor, and a layout that has to work around the new steel.
Key points for your project
- Cooker hood ducting that currently runs out through the wall may need a new route once the wall goes. Ducting can often be run in the ceiling void alongside the beam, but the beam's position and depth need to be known first.
- The structural price depends mainly on the span, what sits above and how the beam ends are supported. Kitchen-related extras, such as moving gas, relocating a soil pipe or rerouting ducting, are listed as separate items so you can see what each one adds.
- While the wall is out you will usually be without a working kitchen for several days. Many households set up a kettle, microwave and fridge in another room for that period and plan simple meals that need little cooking.
- In many houses the kitchen and dining room wall carries the bedroom floor joists, and sometimes a bathroom wall above. Lifting a floorboard upstairs to see which way the joists run is a useful first look, though the engineer confirms what the wall actually supports.
- Where the wall stood there is usually a strip of footing or a change in floor level between the two rooms. It is levelled with screed or timber so one continuous floor finish, such as tiles or engineered boards, can run straight across.
From survey to sign-off in Felling
Free visit
A short visit to Felling to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to Gateshead Council, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
Guide prices for kitchen-diner knock-throughs in Felling
As a guide, budget £2,300–£5,600 including VAT for kitchen-diner knock-through in Felling, based on published UK cost guides adjusted for prices in the North East (-7%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Kitchen-diner knock-through | £2,300–£5,600 | Internal structural wall between kitchen and dining room, steel beam, approvals and making good (kitchen fitting extra) |
| Structural calculations for a beam | £230–£700 | Site measure or photos, beam and padstone design and calculations for building control |
| Plastering and making good | £280–£1,120 | Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up |
| Fire protection to a steel beam | £140–£560 per beam | Fire-rated board boxing or an intumescent coating system as specified |
Figures include our approximate regional adjustment for prices in the North East (-7%) and are rounded. How these figures are worked out.
Approvals in Felling
For Felling, building control is provided by Gateshead Council, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Kitchen-diner knock-throughs in Felling: your questions
Can I stay at home while the work is done in Felling?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.
Do I need a party wall agreement for kitchen-diner knock-throughs in Felling?
Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.
Can the steel beam be hidden in the ceiling?
Yes, a flush beam can be set into the ceiling void so there is no step between the kitchen and dining ceilings. It needs enough joist depth and more labour to connect the joists to the steel, so it costs more than a downstand. The engineer confirms whether it is possible in your house.
Do I need building regulations for a kitchen-diner knock-through?
Yes, if the wall is structural. In England it needs building regulations approval through a full plans application or a building notice, in Wales an application under the Welsh regulations, and electrics and any change to fire escape routes are checked too. Scotland requires a building warrant before work starts, and Northern Ireland requires an application to council building control. We handle the application or notice.
What does a kitchen-diner knock-through quote include?
Our written quote is itemised: survey, engineer's calculations, building control, propping, removal of the wall, steel and padstones, fire protection, floor levelling and making good, with any gas, plumbing or electrical rerouting listed separately. Once the layout, specification and scope are agreed, the price is fixed in writing.