Steel BeamInstallers
Ground-floor chimney breast removed with a short steel beam carrying the breast above

Chimney breast removal · Felling

Chimney breast removal in Felling

Chimney breast removal in Felling, from free survey to completion certificate.

  • Free survey visit in Felling
  • Engineer's calculations arranged
  • Building control handled for you

Free survey in Felling

Tell us about the chimney breast removal job in Felling.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What chimney breast removal involves in Felling

Planning chimney breast removal in Felling? Our team covers NE8, NE9, NE10 and NE11 and the streets around them. Felling is around 2.2 miles from Newcastle upon Tyne, and we cover both. You get one written quote for the calculations, approvals, propping, steel and making good.

We cover the survey visit, structural calculations from a qualified engineer, building control, party wall notices through a party wall surveyor where needed, temporary support, removal, the steelwork and making good. Whether you are taking out the ground-floor breast only or the full height, the itemised written quote shows each stage.

Things to plan for

  • The price depends on how many floors the breast spans, whether the stack is kept or removed, the support method the engineer specifies, roof and scaffold work, and how much rubble needs taking away. Each is listed separately in the quote.
  • A chimney closed off at both ends can trap moisture and cause damp patches on the walls. Where part of a flue remains, a vent at room level and a ventilated cap on the pot keep air moving through it.
  • Once the breast is gone, the wall behind it is often rough, sooty or uneven. It is cleaned back, dubbed out where needed and plastered flat, and the floor where the hearth sat is filled level to meet the surrounding boards or screed.
  • Chimney brickwork is heavy and dirty. Even a single breast produces a lot of rubble and soot, so a skip or waste collection is planned in advance, and floors, stairs and furniture along the route out are protected.
  • If you remove the breast in a ground-floor room but want to keep a fireplace or the breast in the bedroom above, the steel underneath must be designed for that load. Its ends need solid bearings, which may mean pockets cut into the party wall.

What happens, step by step

  1. Survey in Felling

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to Gateshead Council, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

What does chimney breast removal cost in Felling?

As a guide, budget £1,400–£2,800 including VAT for chimney breast removal (ground floor) in Felling, based on published UK cost guides adjusted for prices in the North East (-7%).

JobTypical guide rangeWhat it usually covers
Chimney breast removal (ground floor)£1,400–£2,800Ground-floor breast removed, steel to support the breast above, building control and making good
Through-lounge knock-through£2,300–£5,100Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill
Party wall surveyor (agreed surveyor, per neighbour)£840–£1,860 per neighbourSchedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only)
Plastering and making good£280–£1,120Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up

Figures include our approximate regional adjustment for prices in the North East (-7%) and are rounded. How these figures are worked out.

Approvals in Felling

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Gateshead Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Chimney breast removal near Felling

Questions about chimney breast removal in Felling

How soon can chimney breast removal start in Felling?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Can I stay at home while the work is done in Felling?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Can I remove a chimney breast downstairs and keep the fireplace upstairs?

Usually, as long as the upstairs breast and its flue stay intact and are carried on a support the engineer designs for that load. Building control must approve the arrangement. If the upstairs fireplace has a gas fire, any work on it or its supply must be carried out by a Gas Safe registered engineer.

What if my chimney breast was removed without support?

Get it checked by a structural engineer as soon as possible. If the upper breast or stack has no adequate support, it may need propping straight away. A support can usually be fitted retrospectively, and in England and Wales a regularisation application to the local authority can be used to get the unauthorised work approved.

Will removing a chimney breast cause damp?

It can if the remaining flue is sealed with no airflow, because moisture and condensation get trapped inside. Fitting a vent in the remaining breast or wall and a ventilated cap on the chimney pot keeps air moving. If the stack is removed and the roof made good, the risk from the flue goes away.

Do I need a party wall agreement for chimney breast removal in Felling?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.