Steel BeamInstallers
Steel column with a bolted base plate on a concrete pad supporting a beam

Steel columns & posts · Feltham

Steel columns & posts in Feltham

Steelwork, approvals and making good for steel columns & posts in Feltham and nearby.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Feltham and nearby

Free survey in Feltham

Tell us about the steel columns & post job in Feltham.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Steel columns & posts in Feltham: how it works

Planning steel columns & posts in Feltham? Our team covers TW2, TW3, TW4, TW5 and TW6 and the streets around them. We also cover the surrounding towns and villages in London. You get one written quote for the calculations, approvals, propping, steel and making good.

Sometimes the right support for a beam is not a wall at all. A long span can be broken in two with a slim post in the middle, a beam can land on a column where the masonry below is weak, or the corner of an L-shaped opening can be held up by a single post instead of a brick pier.

What to expect

  • While the existing support is removed or the new column goes in, props hold the beam and the structure above. They are only taken out once the column is fixed, packed tight at the head and grouted at the base.
  • Exposed columns are commonly protected with intumescent paint applied to the thickness the specification calls for, which keeps a slim profile. Boxed columns are clad in fire-rated plasterboard and finished with corner beads, skim and a skirting to match the room.
  • Placing a post well can make an open-plan room work better. It can mark the edge of a kitchen island, frame a dining area or line up with a worktop end, so it reads as part of the design rather than an obstruction.
  • Underfloor heating pipes, drains and cables in the slab can sit right where a pad is wanted. These are traced before cutting, and the column position is adjusted where possible rather than damaging a heating loop or drain run.
  • A post is needed when a beam has nothing adequate to bear on, or when a span is long enough that a central support gives a shallower, lighter beam. The engineer weighs up a column against a deeper beam for each layout.

How the job runs in Feltham

  1. Free visit

    A short visit to Feltham to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

How much should I budget in Feltham?

As a guide, budget £640–£1,920 per column including VAT for steel column or post in Feltham, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Steel column or post£640–£1,920 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Structural calculations for a beam£320–£960Site measure or photos, beam and padstone design and calculations for building control
Basement or cellar steelwork£3,200–£8,300Beams and columns with pad foundations under the floor above (excavation and waterproofing extra)
RSJ supply and fit (single beam)£1,000–£3,200 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Building rules for Feltham

For Feltham, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Steel columns & posts near Feltham

Local questions answered

Can I stay at home while the work is done in Feltham?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

How soon can steel columns & posts start in Feltham?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

How thin can a steel support post be?

It depends entirely on the load, the height and how the post is restrained, so there is no standard size. Hollow sections often give the slimmest look for a given strength, and an engineer can sometimes reduce the section by adding restraint partway up. They specify the exact section after calculating the load.

What is the difference between a column and a padstone?

A padstone is a block bedded into a wall to spread a beam's load into the masonry beneath. A column replaces the need for a wall altogether, carrying the load down to its own foundation. Where the wall below a beam end is too weak for a padstone, the engineer may call for a column instead.

Can a steel column be left exposed?

Yes, many people leave a column on show, painted to suit the room. In homes exposed steel commonly needs fire protection, often intumescent paint applied to the specified thickness as part of a compatible paint system. Building control checks the protection meets what was specified. Boxing in with fire-rated plasterboard is the alternative where a hidden column is preferred.

Can you work on older or listed homes in Feltham?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.