
Steel goalpost frames · Feltham
Steel goalpost frames in Feltham
Steel goalpost frames for homes in TW2, TW3, TW4, designed by a structural engineer.
- Itemised written quote
- Beam sized by a structural engineer
- Covering Feltham and nearby
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
What steel goalpost frames involve in Feltham
For homes in Feltham and the TW2, TW3, TW4, TW5 and TW6 districts, we handle steel goalpost frames from survey to sign-off. The wider London area is covered as well. The beam is sized by a structural engineer and inspected before it is boxed in.
We arrange the engineer's design, building control, the foundation pads, temporary propping and the fabricated frame, then box it in and make good. Everything is set out in one itemised written quote, and the price is fixed in writing once the layout and specification are agreed.
Worth knowing before you start
- Keep the engineer's calculations, the frame drawings and the building control completion certificate together. They show a future buyer's surveyor how the opening is supported and save questions about the columns when the house is sold.
- A goalpost frame usually takes longer than a single beam because the pads need digging, inspecting, pouring and time to gain strength before the columns take load. The engineer sets when the frame can be loaded.
- Column pads can clash with drains, gas pipes and underfloor heating runs below the floor. These are located before digging, and if a drain runs where a pad needs to go, the engineer may move the column or redesign the pad.
- Columns are commonly universal columns or square hollow sections, welded to steel base plates at the foot and cap plates at the head. Holding-down bolts fix the base plates to the pad, and grout fills the gap beneath once the frame is level.
- Price depends on the opening width, the loads the beam carries, the number of bolted connections, the depth of the pads and how easily the steel can be carried in. Any redesign after the ground is opened is priced before it goes ahead.
What happens, step by step
Look and measure
We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.
Design and price
Calculations come back from the engineer and we confirm your fixed written price, line by line.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Fit, inspect, finish
The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.
How much should I budget in Feltham?
As a guide, budget £2,550–£7,700 including VAT for steel goalpost frame in Feltham, based on published UK cost guides adjusted for London prices (+28%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Steel goalpost frame | £2,550–£7,700 | Two posts and a beam bolted as a frame, pad foundations, base plates and fitting |
| Side return extension steelwork | £4,500–£10,900 | Beams and posts along the old side wall line, propping and approvals (extension build extra) |
| Opening into a rear extension | £3,200–£8,950 | Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build |
| Steel column or post | £640–£1,920 per column | Column supplied and fitted with base and cap plates on a pad foundation |
Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.
Approvals in Feltham
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Steel goalpost frames in Feltham: your questions
What happens at the survey visit in Feltham?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.
Who approves steel goalpost frames in Feltham?
Structural work in Feltham needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.
When do you need a goalpost instead of a steel beam?
You need a goalpost when the walls at either end of the opening cannot safely carry the beam. That happens when piers are too narrow, the masonry is weak or cracked, the opening runs almost wall to wall, or the footings below are unsuitable. The structural engineer makes the call after looking at the loads and the bearings available.
Can a goalpost column go next to my neighbour's wall?
It can, but in England and Wales it may bring in the Party Wall etc. Act 1996. Digging a pad near a neighbour's building to below the level of its foundations, or fixing into a shared wall, can be notifiable. We arrange notices through a party wall surveyor where needed. There is no equivalent Act in Scotland or Northern Ireland.
Does a goalpost frame need foundations?
Yes, in most cases each column needs a concrete pad foundation beneath it. A column concentrates a lot of weight on a small area, and a normal floor slab is rarely designed for that. The engineer sizes each pad, and building control usually inspects the excavation before the concrete goes in.