Steel BeamInstallers
Corroded old steel beam exposed for replacement, with props and a new beam on trestles

Steel beam replacement & repair · Tenby

Steel beam replacement & repair in Tenby

Steel beam replacement & repair for homes in SA69, SA70, designed by a structural engineer.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Tenby and nearby

Free survey in Tenby

Tell us about the steel beam replacement & repair job in Tenby.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Steel beam replacement & repair in Tenby: how it works

We cover steel beam replacement & repair in Tenby (SA69, SA70) and the streets around it. We also cover the surrounding towns and villages in Pembrokeshire. Each job is designed by a structural engineer and approved through Pembrokeshire County Council before work begins.

Not every steel beam was put in properly. Some were fitted decades ago without calculations, some sit on crumbling brick or timber packing, and some have rusted where water reached them through a leaking roof, a shopfront or a damp wall. Cracks in the plaster above, doors that stick or a visible dip are common warning signs.

Things to plan for

  • A proper assessment means opening the boxing at the ends and along the span so the engineer can see the steel. In buildings from before 2000, old boxing can contain asbestos insulating board, so it is checked before anyone cuts into it.
  • A repair only lasts if the cause is dealt with too. A leaking roof, blocked gutter or bridged damp-proof course that rusted the beam needs fixing first, otherwise new protective coatings will break down in the same way.
  • Beams fitted without calculations, whether decades ago or more recently without approval, may be smaller than the loads require, particularly in shop conversions and older knock-throughs. An engineer can check the existing section against the actual loads and say whether it is adequate.
  • Whether to strengthen or replace is the engineer's decision. Plating, where steel plates are fixed to the flanges, can add capacity without removing the beam, but it is not suitable for every section, connection or level of damage.
  • Signs that a beam is struggling include diagonal cracks running up from its ends, a visible dip along its length, doors above that start binding, and rust staining through paint or plaster. Any one of these is worth an engineer's look.

From survey to sign-off in Tenby

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit the application or notice to Pembrokeshire County Council under the Building Regulations as they apply in Wales, before work starts.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

Guide prices for steel beam replacement & repair in Tenby

As a guide, budget £1,800–£5,000 including VAT for steel beam replacement in Tenby, based on published UK cost guides adjusted for prices in Wales (-9%).

JobTypical guide rangeWhat it usually covers
Steel beam replacement£1,800–£5,000Propping, removing the failed beam, new steel on proper bearings, approval and making good
Temporary works and propping£140–£460Props, spreaders, needles and sole plates for a typical opening, installed and struck
RSJ supply and fit (single beam)£730–£2,280 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Fire protection to a steel beam£140–£550 per beamFire-rated board boxing or an intumescent coating system as specified

Figures include our approximate regional adjustment for prices in Wales (-9%) and are rounded. How these figures are worked out.

Approvals in Tenby

Welsh building regulations treat beams and new openings as controlled building work. We apply to Pembrokeshire County Council on your behalf before anything is removed, give the commencement notice the 2026 Welsh rules require, and the steel is checked before it is boxed in.

Where the steel bears into a wall shared with next door, notice must be served under the Party Wall etc. Act 1996. If your neighbour dissents, surveyors agree how the work is done before it starts.

Building rules in Wales

Steel beam replacement & repair near Tenby

Questions about steel beam replacement & repair in Tenby

Who approves steel beam replacement & repair in Tenby?

Structural work in Tenby needs a building control application to Pembrokeshire County Council under the Welsh regulations, with a commencement notice before work starts. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

Do I need a party wall agreement for steel beam replacement & repair in Tenby?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

How do I know if my steel beam is failing?

Look for cracks spreading from the ends of the beam, a dip you can see along its length, sticking doors or sloping floors above, and rust stains coming through the boxing. These signs do not always mean the steel is failing, but they do mean an engineer should inspect it and find the cause.

Can an old shop beam be replaced while the flat above is occupied?

Often, yes, with careful planning. The front wall and floors above are propped from inside the shop, and sometimes from outside, before the old beam is cut out. Occupants can often stay in if the engineer is satisfied with the propping, though there will be noise for a few days. Where the flat is separately owned, access and consents need agreeing in advance.

What does it mean to plate a steel beam?

Plating means fixing extra steel plates to the beam, usually along the flanges, to increase its strength or stiffness without taking it out. The plates are bolted or welded according to the engineer's design. It suits some beams well, but not all, and the engineer checks the connections and bearings before specifying it.

What happens at the survey visit in Tenby?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.