Steel BeamInstallers
Corroded old steel beam exposed for replacement, with props and a new beam on trestles

Steel beam replacement & repair · Greenwich

Steel beam replacement & repair in Greenwich

Steel beam replacement & repair in Greenwich, from free survey to completion certificate.

  • Free survey visit in Greenwich
  • Engineer's calculations arranged
  • Building control handled for you

Free survey in Greenwich

Tell us about the steel beam replacement & repair job in Greenwich.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What steel beam replacement & repair involves in Greenwich

Planning steel beam replacement & repair in Greenwich? Our team covers E14, SE3, SE4, SE7 and SE8 and the streets around them. We also cover the surrounding towns and villages in London. You get one written quote for the calculations, approvals, propping, steel and making good.

Not every steel beam was put in properly. Some were fitted decades ago without calculations, some sit on crumbling brick or timber packing, and some have rusted where water reached them through a leaking roof, a shopfront or a damp wall. Cracks in the plaster above, doors that stick or a visible dip are common warning signs.

What to expect

  • Older beams were often left with no fire protection or boxed in ordinary materials. When a beam is repaired or replaced, the fire protection is brought up to what the engineer and building control specify, commonly fire-rated plasterboard or intumescent paint.
  • A proper assessment means opening the boxing at the ends and along the span so the engineer can see the steel. In buildings from before 2000, old boxing can contain asbestos insulating board, so it is checked before anyone cuts into it.
  • Corrosion usually starts where water reaches the steel: under a leaking flat roof, behind a shopfront fascia, in a damp external wall or at a cellar ceiling. Light surface rust can often be cleaned and treated, while heavy loss of section changes the beam's strength.
  • Beams fitted without calculations, whether decades ago or more recently without approval, may be smaller than the loads require, particularly in shop conversions and older knock-throughs. An engineer can check the existing section against the actual loads and say whether it is adequate.
  • A repair only lasts if the cause is dealt with too. A leaking roof, blocked gutter or bridged damp-proof course that rusted the beam needs fixing first, otherwise new protective coatings will break down in the same way.

What happens, step by step

  1. Free visit

    A short visit to Greenwich to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

What does steel beam replacement & repair cost in Greenwich?

As a guide, budget £2,550–£7,050 including VAT for steel beam replacement in Greenwich, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Steel beam replacement£2,550–£7,050Propping, removing the failed beam, new steel on proper bearings, approval and making good
RSJ supply and fit (single beam)£1,000–£3,200 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Building control fees£320–£830Building notice or full plans fee and inspections; varies by council or approver
Shop or commercial structural opening£6,400–£19,200Transfer beam and columns for opening units together or forming a shopfront opening

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Building control and neighbours in Greenwich

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Steel beam replacement & repair near Greenwich

Local questions answered

What happens at the survey visit in Greenwich?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Who approves steel beam replacement & repair in Greenwich?

Structural work in Greenwich needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

My house has a beam with no paperwork. What should I do?

Start with an engineer's inspection to establish what the beam is and whether it is adequate. If it is, a regularisation application in England and Wales can seek retrospective approval; if it is not, the engineer specifies a repair or replacement that then goes through building control. Your solicitor can advise on any legal side of a sale.

How long does it take to replace a steel beam?

Anything from a day or two to around a week on site, depending on what the engineer specifies. Rebuilding a crushed bearing can be quick, while cutting out an old beam and fitting a new one in a typical room takes longer. Plastering and redecoration follow once building control has inspected the new steel.

What does it mean to plate a steel beam?

Plating means fixing extra steel plates to the beam, usually along the flanges, to increase its strength or stiffness without taking it out. The plates are bolted or welded according to the engineer's design. It suits some beams well, but not all, and the engineer checks the connections and bearings before specifying it.

Can you work on older or listed homes in Greenwich?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.