
Temporary works & propping · Greenwich
Temporary works & propping in Greenwich
Temporary works & propping for homes in E14, SE3, SE4, designed by a structural engineer.
- Itemised written quote
- Beam sized by a structural engineer
- Covering Greenwich and nearby
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
About our temporary works & propping service in Greenwich
We carry out temporary works & propping in Greenwich, covering the E14, SE3, SE4, SE7 and SE8 postcode districts. The wider London area is covered as well. The job starts with a free survey visit so the engineer's calculations are based on your actual walls, floors and loads.
Propping is included in every structural job we quote, and we can also provide it as a separate service where a wall, lintel or chimney needs supporting while other work goes on. The layout of props, needles and spreaders follows the engineer's calculations or a temporary works design for the job.
Things to plan for
- When an external wall is propped, the opening is sheeted against rain and the house is kept secure overnight. Where props stand outside, ground conditions, drains and access paths are taken into account before they are set up.
- Adjustable steel props are the workhorse, with timber spreaders on top to share the load across several joists. Steel needles pass through the wall to carry masonry above an opening, and prop head attachments known as masonry support heads support brickwork without needles.
- Typical mistakes include props standing on unsupported floorboards, missing spreaders so one joist takes all the load, and props wound up too hard so the ceiling lifts and cracks. Careful setting out and gradual tightening avoid all three.
- Props and needles cannot go where pipes, cables or flues run. Their positions are checked against services before any holes are cut, and anything in the way is isolated or rerouted first by the appropriate trade.
- For simple openings, the engineer's calculations usually show the propping arrangement. Larger or unusual jobs, such as removing several walls or working beneath chimney stacks, may need a separate temporary works design prepared by an engineer.
From survey to sign-off in Greenwich
Survey in Greenwich
We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.
Engineer's design
A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Install and sign-off
Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.
Guide prices for temporary works & propping in Greenwich
As a guide, budget £190–£640 including VAT for temporary works and propping in Greenwich, based on published UK cost guides adjusted for London prices (+28%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Temporary works and propping | £190–£640 | Props, spreaders, needles and sole plates for a typical opening, installed and struck |
| Party wall surveyor (agreed surveyor, per neighbour) | £1,150–£2,550 per neighbour | Schedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only) |
| RSJ supply and fit (single beam) | £1,000–£3,200 per beam | Beam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately) |
| Lintel replacement | £510–£1,540 per lintel | Propping, removing the old lintel, new lintel set on beds and brickwork made good |
Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.
Building rules for Greenwich
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Temporary works & propping near Greenwich
- Blackheath 1.2 mi
- Catford 2.3 mi
- Peckham 2.5 mi
- Canning Town 2.8 mi
- Eltham 3.3 mi
- Bow 3.3 mi
Questions about temporary works & propping in Greenwich
How much do temporary works & propping cost in Greenwich?
As a guide, budget £190–£640 including VAT for temporary works and propping in Greenwich, based on published UK cost guides adjusted for London prices (+28%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.
How many props do I need to take out a load-bearing wall?
It depends on the span, the weight above and the strength of the floor the props stand on. The engineer's calculations or a temporary works design set the number and spacing. It is not something to guess, because too few props, or props in the wrong place, can let the structure move.
What if props need to go on my neighbour's side of the wall?
Then their agreement is needed first. Where needles pass through a party wall, props may have to stand on the neighbour's side, and in England and Wales that work is normally covered by party wall notices served before work starts. We arrange notices through a party wall surveyor where they are required.
What is needling a wall?
Needling means cutting holes through a wall just above where an opening will go and passing short steel beams, called needles, through them. Each needle is supported on props on both sides, so the masonry above rests on the needles while the wall below is removed and the permanent beam is fitted.