RSJ installation · Exeter
RSJ installation in Exeter
RSJ installation for homes in EX1, EX2, EX4, designed by a structural engineer.
- Itemised written quote
- Beam sized by a structural engineer
- Covering Exeter and nearby
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
About our RSJ installation service in Exeter
For homes in Exeter and the EX1, EX2 and EX4 districts, we handle RSJ installation from survey to sign-off. We also cover the surrounding towns and villages in Devon. The beam is sized by a structural engineer and inspected before it is boxed in.
We supply and fit the steel from start to finish. That includes arranging the calculations, having the beam fabricated with the right end plates, holes and primer, getting it into the property, setting it on its bearings, and packing it so it takes the load. Building control, propping and making good sit in the same itemised quote.
Worth knowing before you start
- Floor joists can rest on the bottom flange, hang from timber packers bolted into the web, or be notched to sit over the steel. The engineer specifies the connection, and it affects how flush the finished ceiling can be.
- Structural steel comes in recognised grades, and the engineer's drawing states which grade the calculations assume. The steel supplied matches that specification, and the delivery paperwork is kept so building control can see what has been fitted.
- An RSJ inside a home commonly needs 30-minute fire resistance where it supports elements of structure. Fire-rated plasterboard boxing is the usual method, with intumescent paint used when the beam is to remain visible.
- If you already hold calculations from an architect or engineer, we install to those. Where something on site differs from the drawing, such as a weaker wall or a different joist direction, the engineer is asked to confirm before work carries on.
- Packing is what makes the beam work. Steel shims and dry-pack mortar fill the gap between the top flange and the structure above, so the load transfers onto the steel without the floor or wall settling down onto it.
What happens, step by step
Free visit
A short visit to Exeter to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
What does RSJ installation cost in Exeter?
As a guide, budget £820–£2,580 per beam including VAT for rSJ supply and fit (single beam) in Exeter, based on published UK cost guides adjusted for prices in the South West (+3%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| RSJ supply and fit (single beam) | £820–£2,580 per beam | Beam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately) |
| Structural calculations for a beam | £260–£770 | Site measure or photos, beam and padstone design and calculations for building control |
| Steel beam replacement | £2,050–£5,650 | Propping, removing the failed beam, new steel on proper bearings, approval and making good |
| Temporary works and propping | £150–£520 | Props, spreaders, needles and sole plates for a typical opening, installed and struck |
Figures include our approximate regional adjustment for prices in the South West (+3%) and are rounded. How these figures are worked out.
Building rules for Exeter
Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Questions about RSJ installation in Exeter
Do I need a party wall agreement for RSJ installation in Exeter?
Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.
Who approves RSJ installation in Exeter?
Structural work in Exeter needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.
Is an RSJ the same as a steel beam?
In everyday use, yes. Builders and homeowners call most steel beams RSJs, whether they are universal beams, channels or columns. Technically an RSJ is one particular older section shape, but the engineer's drawing names the exact section type, so there is no confusion on site.
How heavy is an RSJ and how is it lifted?
Weight varies widely with the section and length, from beams a small team can carry to steels needing mechanical lifting. The lift is planned at the survey, using enough people, trolleys and suitable lifting equipment so the beam goes up safely and level onto both bearings.
Can you fit an RSJ to my own engineer's calculations?
Yes. We install to calculations and drawings from your engineer or architect, as long as they cover the beam, bearings and any columns or connections. If site conditions differ from what the design assumed, we check with the engineer before carrying on.
What happens at the survey visit in Exeter?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.