Fire protection for steel beams · Exeter
Fire protection for steel beams in Exeter
Fire protection for steel beams in Exeter, from free survey to completion certificate.
- Itemised written quote
- Beam sized by a structural engineer
- Covering Exeter and nearby
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
What fire protection for steel beams involves in Exeter
Fire protection for steel beams in Exeter is planned around the house, not a standard kit. Our coverage runs across Devon, so nearby villages are included too. We visit, measure and check what the wall carries, then arrange calculations and building control approval before any steel is ordered.
We fit fire protection alongside new steelwork, and as a standalone job where steel was installed without it or building control has asked for more. That covers boxing with fire-rated plasterboard, intumescent coatings for steel left on show, and the records building control needs to see before signing the work off.
Key points for your project
- Building control treats fire protection as part of the structural approval, not an optional extra. If unprotected steel is found at inspection, the completion certificate is normally held back until the protection is in place and has been checked.
- Boxing a single beam usually takes around a day, plus skimming and drying. Intumescent coatings need each coat to dry before the next goes on, so they can take several days depending on the thickness required and the room temperature.
- The fire resistance needed depends on the building and where the steel sits. In a typical two-storey house, elements of structure commonly need 30 minutes, but taller homes, flats and commercial premises can need more. The engineer and building control confirm the figure.
- Fire boarding should not be cut into casually later on. Downlights, cables and pipes pushed through the boxing can weaken it, so services are planned before boarding, and any openings are sealed with suitable fire-stopping materials.
- Keep a record of what was fitted: the board type and number of layers, or the coating product, thickness readings and number of coats. Building control may ask for it, and it helps answer queries when the house is sold.
From survey to sign-off in Exeter
Free visit
A short visit to Exeter to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
Guide prices for fire protection for steel beams in Exeter
As a guide, budget £150–£620 per beam including VAT for fire protection to a steel beam in Exeter, based on published UK cost guides adjusted for prices in the South West (+3%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Fire protection to a steel beam | £150–£620 per beam | Fire-rated board boxing or an intumescent coating system as specified |
| Building control fees | £260–£670 | Building notice or full plans fee and inspections; varies by council or approver |
| Plastering and making good | £310–£1,240 | Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up |
| Steel column or post | £520–£1,540 per column | Column supplied and fitted with base and cap plates on a pad foundation |
Figures include our approximate regional adjustment for prices in the South West (+3%) and are rounded. How these figures are worked out.
Approvals in Exeter
For Exeter, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Questions about fire protection for steel beams in Exeter
Can I stay at home while the work is done in Exeter?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.
What happens at the survey visit in Exeter?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.
What is intumescent paint for steel beams?
Intumescent paint is a fire-protective coating that swells when heated, forming a thick insulating layer that slows the steel heating up. It lets you leave a beam on show while still meeting fire requirements. It must be applied at a specified thickness over a compatible primer, so it goes on to a written specification rather than like ordinary paint.
How long does intumescent paint take to apply?
Several days in most cases. Each coat has to dry before the next is applied, and the number of coats depends on the thickness needed. Cold or damp rooms slow drying, so the space is kept warm and ventilated, and the top coat goes on once the full build has been measured.
My steel beam was fitted years ago without fire protection. What should I do?
Have it looked at and protected to current requirements. Unprotected steel can raise questions when you sell, and if the original work was never approved, a regularisation application to building control may be needed in England and Wales. We can survey the steel and price both the protection and the paperwork route.
Do I need a party wall agreement for fire protection for steel beams in Exeter?
Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.