Steel BeamInstallers
Hallway doorway widened into a larger opening with a new lintel before plastering

Wider doorways & openings · Bognor Regis

Wider doorways & openings in Bognor Regis

Wider doorways & openings for homes in PO21, PO22, designed by a structural engineer.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Bognor Regis

Tell us about the wider doorways & opening job in Bognor Regis.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our wider doorways & openings service in Bognor Regis

Bognor Regis has a mix of housing, and wider doorways & openings need a slightly different approach in each. Bognor Regis is around 13.5 miles from Worthing, and we cover both. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.

Not every layout change needs a whole wall out. Widening a cramped doorway, adding a second door into a room or forming a wide opening between hall and living room can change how a home flows while keeping most of the wall, along with its storage space and furniture positions.

What to expect

  • Forming or widening an opening in a load-bearing wall is building work needing building regulations approval in England and Wales. In Scotland a building warrant is required before work starts, and in Northern Ireland an application is made to the council's building control.
  • Older door surrounds and walls can hide asbestos in textured coatings, insulating board above doors or panelling. In buildings built before 2000 it must be identified before the wall is cut, so a refurbishment survey of the area is arranged where there is a risk.
  • Widening a single doorway in a load-bearing wall usually takes one to two days for the structural work. The plaster then needs time to dry before the door linings are decorated or a new door is hung.
  • Light switches, sockets and cables often sit right beside a doorway. These are moved before cutting, and any electrical alterations in England must comply with Part P of the building regulations where they are notifiable.
  • Each side of the new opening needs enough solid wall for the lintel or beam to sit on. If the opening runs close to a corner, another doorway or a chimney breast, there may not be enough masonry, and a column or padstone may be required.

What happens, step by step

  1. Free visit

    A short visit to Bognor Regis to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

Guide prices for wider doorways & openings in Bognor Regis

As a guide, budget £1,100–£2,800 including VAT for widening an internal doorway in Bognor Regis, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Widening an internal doorway£1,100–£2,800Opening widened with a new lintel or short beam, approval where structural, and making good
RSJ supply and fit (single beam)£900–£2,800 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Load-bearing wall removal with steel beam£2,250–£5,600Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Plastering and making good£340–£1,340Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building control and neighbours in Bognor Regis

Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Wider doorways & openings near Bognor Regis

Wider doorways & openings in Bognor Regis: your questions

Do I need a party wall agreement for wider doorways & openings in Bognor Regis?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Can you work on older or listed homes in Bognor Regis?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

How wide can I make a doorway?

That depends on the wall, what it carries and how much solid wall is left at each side for the support to bear on, and a structural engineer sets the limit. Many people go from a single door to a double-width opening, and beyond that the job starts to become a partial wall removal.

How long does it take to widen a doorway?

The structural part usually takes one to two working days: propping, cutting the opening, fitting the lintel or beam and packing it. Plastering follows, then a few days of drying before linings are painted or a new door is hung. Building control inspection fits in once the support is in place.

Can I move a doorway to a different position?

Usually, yes. The old doorway is blocked up and a new opening is formed with the support the engineer specifies, and both changes are dealt with together for building control if the wall is structural. Moving a door can release wall space for furniture or a better kitchen or bedroom layout.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.