
Steel goalpost frames · Gelligaer
Steel goalpost frames in Gelligaer
Steel goalpost frames for homes in CF81, CF82, NP12, designed by a structural engineer.
- Price fixed in writing once scope is agreed
- Building control arranged
- Temporary works and making good included
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
What steel goalpost frames involve in Gelligaer
Planning steel goalpost frames in Gelligaer? Our team covers CF81, CF82 and NP12 and the streets around them. Our coverage runs across Caerphilly, so nearby villages are included too. You get one written quote for the calculations, approvals, propping, steel and making good.
When a rear wall is opened almost corner to corner, or the brickwork either side is too thin, cracked or broken up by openings to take a concentrated load, a beam on padstones is not enough. A goalpost frame brings its own supports: two columns carry the beam's ends straight down to new foundations, so the walls around the opening are not relied on.
Worth knowing before you start
- Stability is part of the design, not just strength. A frame standing in a wide opening can sway sideways if the joints are too flexible, so the engineer decides whether the connections must be moment-resisting or whether the frame is tied back to the surrounding structure.
- Goalpost frames are made to measure, so accurate site dimensions matter. Floor-to-ceiling height, the finished floor level and the width between column positions are taken before fabrication, because a frame that is a few millimetres out cannot simply be trimmed on site.
- A goalpost frame usually takes longer than a single beam because the pads need digging, inspecting, pouring and time to gain strength before the columns take load. The engineer sets when the frame can be loaded.
- Columns can be boxed in with fire-rated plasterboard to look like small piers, built into new stud walls, or left exposed and painted. Where an extension wall continues past the opening, a column can often sit within it out of sight.
- Each column usually needs its own concrete pad foundation, because a column delivers a heavy point load that an ordinary floor slab or old strip footing may not take. The engineer sets the pad size and depth from the load and the ground conditions found.
What happens, step by step
Look and measure
We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.
Design and price
Calculations come back from the engineer and we confirm your fixed written price, line by line.
Building control
We submit the application or notice to Caerphilly County Borough Council under the Building Regulations as they apply in Wales, before work starts.
Fit, inspect, finish
The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.
What do steel goalpost frames cost in Gelligaer?
As a guide, budget £1,800–£5,450 including VAT for steel goalpost frame in Gelligaer, based on published UK cost guides adjusted for prices in Wales (-9%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Steel goalpost frame | £1,800–£5,450 | Two posts and a beam bolted as a frame, pad foundations, base plates and fitting |
| Rear wall opening for bi-fold or sliding doors | £2,300–£6,350 | External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately) |
| RSJ supply and fit (single beam) | £730–£2,280 per beam | Beam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately) |
| Side return extension steelwork | £3,200–£7,750 | Beams and posts along the old side wall line, propping and approvals (extension build extra) |
Figures include our approximate regional adjustment for prices in Wales (-9%) and are rounded. How these figures are worked out.
Building control and neighbours in Gelligaer
In Wales, structural alterations come under the Building Regulations 2010 as they apply in Wales. Caerphilly County Borough Council handles building control for Gelligaer. For work started or approved from 1 July 2026, the Welsh system uses an application to building control, dutyholders appointed in writing, a commencement notice before work starts and a compliance statement at the end.
The Party Wall etc. Act 1996 applies in Wales as well as England, so a beam bearing into a shared wall needs a party structure notice at least two months before work starts. We arrange notices through a party wall surveyor.
Local questions answered
What happens at the survey visit in Gelligaer?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.
Can I stay at home while the work is done in Gelligaer?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.
What is a goalpost frame in an extension?
A goalpost frame is a steel beam sitting on two steel columns, bolted together so it stands as one unit. In an extension it is usually placed where the old rear wall was, holding up the house above while leaving a wide, clear opening. The columns rest on concrete pads, so the frame does not depend on the surrounding brickwork.
Is a goalpost frame more expensive than a beam?
Generally yes, because there is more steel, more fabrication and new foundations to dig and pour. Against that, a goalpost can avoid rebuilding weak piers or strengthening walls so they can take a beam. Our itemised written quote shows the frame, pads, propping and making good separately so you can see where the cost sits.
How long does it take to install a steel goalpost?
Allow around one to two weeks on site for a typical job. Breaking out and digging the pads, the foundation inspection, pouring concrete and letting it gain strength take up much of that time. Erecting and bolting the frame itself is often done in a day, followed by inspection and boxing in.