Steel BeamInstallers
Two installers seen from behind lifting a steel beam onto a padstone

RSJ installation · Gelligaer

RSJ installation in Gelligaer

RSJ installation in Gelligaer, from free survey to completion certificate.

  • Free survey visit in Gelligaer
  • Engineer's calculations arranged
  • Building control handled for you

Free survey in Gelligaer

Tell us about the RSJ installation job in Gelligaer.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning RSJ installation in Gelligaer

Gelligaer has a mix of housing, and RSJ installation needs a slightly different approach in each. We also cover the surrounding towns and villages in Caerphilly. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.

We supply and fit the steel from start to finish. That includes arranging the calculations, having the beam fabricated with the right end plates, holes and primer, getting it into the property, setting it on its bearings, and packing it so it takes the load. Building control, propping and making good sit in the same itemised quote.

Worth knowing before you start

  • Sometimes two beams are bolted side by side with spacers, either to carry a thick wall or to fit through a tight space. Bolt spacing and spacer type come from the engineer's design rather than being decided on site.
  • Where a long beam cannot be carried into a property in one piece, the engineer can design a bolted splice so it arrives in two or more lengths. The splice position and bolts are part of the calculations and must be installed exactly as drawn.
  • An RSJ inside a home commonly needs 30-minute fire resistance where it supports elements of structure. Fire-rated plasterboard boxing is the usual method, with intumescent paint used when the beam is to remain visible.
  • Heavy steels are raised with suitable lifting equipment rather than by hand alone. Manual handling is planned so nobody carries more than is safe, and the lift is coordinated so the beam goes up level onto both bearings together.
  • Delivery can make or break an RSJ job. A long beam has to turn through a front door, along a hallway and past the stairs, so routes are measured at the survey and alternatives such as a window opening are planned early.

How the job runs in Gelligaer

  1. Free visit

    A short visit to Gelligaer to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit the application or notice to Caerphilly County Borough Council under the Building Regulations as they apply in Wales, before work starts.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

How much should I budget in Gelligaer?

As a guide, budget £730–£2,280 per beam including VAT for rSJ supply and fit (single beam) in Gelligaer, based on published UK cost guides adjusted for prices in Wales (-9%).

JobTypical guide rangeWhat it usually covers
RSJ supply and fit (single beam)£730–£2,280 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Steel goalpost frame£1,800–£5,450Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Steel beam replacement£1,800–£5,000Propping, removing the failed beam, new steel on proper bearings, approval and making good
Load-bearing wall removal with steel beam£1,800–£4,550Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good

Figures include our approximate regional adjustment for prices in Wales (-9%) and are rounded. How these figures are worked out.

Building control and neighbours in Gelligaer

Removing a load-bearing wall in Wales needs approval under the Welsh building regulations before work starts. For Gelligaer the application goes to Caerphilly County Borough Council or a registered building control approver, with the engineer's calculations, and a completion certificate follows the final inspection.

Where the steel bears into a wall shared with next door, notice must be served under the Party Wall etc. Act 1996. If your neighbour dissents, surveyors agree how the work is done before it starts.

Building rules in Wales

RSJ installation near Gelligaer

RSJ installation in Gelligaer: your questions

Do you also work near Gelligaer?

Yes. We also cover nearby towns including Blackwood, Pontypridd, Risca and Ebbw Vale.

What happens at the survey visit in Gelligaer?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Does an RSJ need to be painted or boxed in?

Usually it needs fire protection, most often by boxing in with fire-rated plasterboard and skimming. If you want the steel on show, an intumescent paint system can be applied to the specified thickness and then top-coated in your chosen colour. The fabrication primer is not fire protection on its own.

What does RSJ stand for?

RSJ stands for rolled steel joist. It was the name for a hot-rolled I-shaped steel section with tapered flanges, and it is still used loosely for any steel beam in a house. Most steels fitted in homes today are universal beams, which do the same job with parallel flanges.

How is an RSJ installed?

The structure above is propped, the wall or opening is prepared, and padstones are bedded at each end. The beam is lifted onto them, bolted where needed and packed with shims and dry-pack. Props come out once it is carrying, building control inspects it, and the steel is then fire protected and finished.

Do I need a party wall agreement for RSJ installation in Gelligaer?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.