Steel BeamInstallers
Grey steel goalpost frame installed where a rear wall has been removed

Steel goalpost frames · Rhondda

Steel goalpost frames in Rhondda

Steel goalpost frames in Rhondda, from free survey to completion certificate.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Rhondda and nearby

Free survey in Rhondda

Tell us about the steel goalpost frame job in Rhondda.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What steel goalpost frames involve in Rhondda

Our steel goalpost frames service in Rhondda covers everything from the first visit to the completion paperwork. We also cover the surrounding towns and villages in Rhondda Cynon Taf. Postcode districts we cover here include CF40, CF41, CF42 and CF43.

When a rear wall is opened almost corner to corner, or the brickwork either side is too thin, cracked or broken up by openings to take a concentrated load, a beam on padstones is not enough. A goalpost frame brings its own supports: two columns carry the beam's ends straight down to new foundations, so the walls around the opening are not relied on.

What to expect

  • Columns are commonly universal columns or square hollow sections, welded to steel base plates at the foot and cap plates at the head. Holding-down bolts fix the base plates to the pad, and grout fills the gap beneath once the frame is level.
  • Columns can be boxed in with fire-rated plasterboard to look like small piers, built into new stud walls, or left exposed and painted. Where an extension wall continues past the opening, a column can often sit within it out of sight.
  • Each column usually needs its own concrete pad foundation, because a column delivers a heavy point load that an ordinary floor slab or old strip footing may not take. The engineer sets the pad size and depth from the load and the ground conditions found.
  • A goalpost frame differs from a simple beam because the beam does not rely on the walls at its ends. The two columns and the beam are connected so the whole frame carries the load down into foundations of its own.
  • A goalpost frame usually takes longer than a single beam because the pads need digging, inspecting, pouring and time to gain strength before the columns take load. The engineer sets when the frame can be loaded.

From survey to sign-off in Rhondda

  1. Survey in Rhondda

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit the application or notice to Rhondda Cynon Taf County Borough Council under the Building Regulations as they apply in Wales, before work starts.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

What do steel goalpost frames cost in Rhondda?

As a guide, budget £1,800–£5,450 including VAT for steel goalpost frame in Rhondda, based on published UK cost guides adjusted for prices in Wales (-9%).

JobTypical guide rangeWhat it usually covers
Steel goalpost frame£1,800–£5,450Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Rear wall opening for bi-fold or sliding doors£2,300–£6,350External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
RSJ supply and fit (single beam)£730–£2,280 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Side return extension steelwork£3,200–£7,750Beams and posts along the old side wall line, propping and approvals (extension build extra)

Figures include our approximate regional adjustment for prices in Wales (-9%) and are rounded. How these figures are worked out.

Approvals in Rhondda

Removing a load-bearing wall in Wales needs approval under the Welsh building regulations before work starts. For Rhondda the application goes to Rhondda Cynon Taf County Borough Council or a registered building control approver, with the engineer's calculations, and a completion certificate follows the final inspection.

Where the steel bears into a wall shared with next door, notice must be served under the Party Wall etc. Act 1996. If your neighbour dissents, surveyors agree how the work is done before it starts.

Building rules in Wales

Steel goalpost frames near Rhondda

Questions about steel goalpost frames in Rhondda

Do I need a party wall agreement for steel goalpost frames in Rhondda?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Can you work on older or listed homes in Rhondda?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Is a goalpost frame more expensive than a beam?

Generally yes, because there is more steel, more fabrication and new foundations to dig and pour. Against that, a goalpost can avoid rebuilding weak piers or strengthening walls so they can take a beam. Our itemised written quote shows the frame, pads, propping and making good separately so you can see where the cost sits.

What is a goalpost frame in an extension?

A goalpost frame is a steel beam sitting on two steel columns, bolted together so it stands as one unit. In an extension it is usually placed where the old rear wall was, holding up the house above while leaving a wide, clear opening. The columns rest on concrete pads, so the frame does not depend on the surrounding brickwork.

Does a goalpost frame need foundations?

Yes, in most cases each column needs a concrete pad foundation beneath it. A column concentrates a lot of weight on a small area, and a normal floor slab is rarely designed for that. The engineer sizes each pad, and building control usually inspects the excavation before the concrete goes in.

What happens at the survey visit in Rhondda?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.