Steel BeamInstallers
Steel column with a bolted base plate on a concrete pad supporting a beam

Steel columns & posts · Shepherds Bush

Steel columns & posts in Shepherds Bush

Steelwork, approvals and making good for steel columns & posts in Shepherds Bush and nearby.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Shepherds Bush

Tell us about the steel columns & post job in Shepherds Bush.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our steel columns & posts service in Shepherds Bush

If you live in Shepherds Bush, steel columns & posts can usually be planned and priced after a single survey visit. The wider London area is covered as well. We cover SW5, W6, W8, W9 and W10, and we fix the price in writing once the layout and scope are agreed.

Sometimes the right support for a beam is not a wall at all. A long span can be broken in two with a slim post in the middle, a beam can land on a column where the masonry below is weak, or the corner of an L-shaped opening can be held up by a single post instead of a brick pier.

Things to plan for

  • Columns on upper floors cannot simply stand on joists. The load has to be traced down through the building to the ground, which can mean a column directly below, a beam to collect it, or a redesign of the layout.
  • The base plate is welded to the foot of the column and fixed to the pad with holding-down bolts. A cap plate at the top bolts to the beam above, so the two act together and the beam cannot slide off its support.
  • Adding a structural column is building work that building control needs to approve, with the pad usually inspected before concrete and the column before it is covered. The completion certificate at the end is the record to keep for any future sale.
  • Hollow sections, either square or circular, give a neat, slim profile and are common where a post stays on show. Universal columns have an H-shaped section and are often used where the post will be boxed in or built into a wall.
  • A post is needed when a beam has nothing adequate to bear on, or when a span is long enough that a central support gives a shallower, lighter beam. The engineer weighs up a column against a deeper beam for each layout.

What happens, step by step

  1. Survey in Shepherds Bush

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

How much should I budget in Shepherds Bush?

As a guide, budget £640–£1,920 per column including VAT for steel column or post in Shepherds Bush, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Steel column or post£640–£1,920 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Steel goalpost frame£2,550–£7,700Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
RSJ supply and fit (single beam)£1,000–£3,200 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Kitchen-diner knock-through£3,200–£7,700Internal structural wall between kitchen and dining room, steel beam, approvals and making good (kitchen fitting extra)

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Building rules for Shepherds Bush

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Steel columns & posts near Shepherds Bush

Questions about steel columns & posts in Shepherds Bush

Do you also work near Shepherds Bush?

Yes. We also cover nearby towns including Notting Hill, Chiswick, Fulham and Willesden.

Do you cover Shepherds Bush for steel columns & posts?

Yes. We carry out steel columns & posts in Shepherds Bush and the SW5, W6, W8, W9 and W10 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

How thin can a steel support post be?

It depends entirely on the load, the height and how the post is restrained, so there is no standard size. Hollow sections often give the slimmest look for a given strength, and an engineer can sometimes reduce the section by adding restraint partway up. They specify the exact section after calculating the load.

Will a column interfere with underfloor heating?

It can, because the pad has to be dug through the floor where pipes may run. We trace heating loops, drains and cables before cutting and, where possible, move the column position slightly to miss them. If a loop has to be cut, it is repaired and pressure tested by a heating engineer before the floor is reinstated.

Do I need building control for a steel column?

Yes. A new structural column is building work under the building regulations in England and Wales, and needs a building warrant first in Scotland and a building control application in Northern Ireland. Inspectors normally check the foundation excavation and the fixed column before it is covered. We deal with the application, notices and inspection visits.

Can I stay at home while the work is done in Shepherds Bush?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.