Steel BeamInstallers
Finished open-plan kitchen diner with a plastered boxed beam across the ceiling

Kitchen-diner knock-throughs · Shepherds Bush

Kitchen-diner knock-throughs in Shepherds Bush

Kitchen-diner knock-throughs for homes in SW5, W6, W8, designed by a structural engineer.

  • Free survey visit in Shepherds Bush
  • Engineer's calculations arranged
  • Building control handled for you

Free survey in Shepherds Bush

Tell us about the kitchen-diner knock-through job in Shepherds Bush.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Kitchen-diner knock-throughs in Shepherds Bush: how it works

For homes in Shepherds Bush and the SW5, W6, W8, W9 and W10 districts, we handle kitchen-diner knock-throughs from survey to sign-off. The wider London area is covered as well. The beam is sized by a structural engineer and inspected before it is boxed in.

We plan the structural work alongside your kitchen design so the beam, any column and the services all land in the right place before units are ordered. A survey visit, engineer's calculations, building control, propping, the steel and making good are all covered in one itemised written quote, with the price fixed in writing once the layout and specification are agreed.

Things to plan for

  • The structural price depends mainly on the span, what sits above and how the beam ends are supported. Kitchen-related extras, such as moving gas, relocating a soil pipe or rerouting ducting, are listed as separate items so you can see what each one adds.
  • Cooker hood ducting that currently runs out through the wall may need a new route once the wall goes. Ducting can often be run in the ceiling void alongside the beam, but the beam's position and depth need to be known first.
  • Older kitchens can hide asbestos in textured ceiling coatings, floor tiles, boxing around pipes or the backing of old heaters. In buildings from before 2000 it must be identified before the fabric is disturbed, so a survey of the affected area is arranged first.
  • Settle the kitchen layout before the steel is designed. If the engineer needs a column or a deeper beam, it is far easier to plan an island, tall units or the hob position around it at drawing stage than after the units are ordered.
  • A flush beam sits up within the depth of the ceiling so the kitchen and dining ceilings run as one flat surface. It suits continuous downlights and long runs of wall units, but each joist has to be connected into the beam, which adds labour.

From survey to sign-off in Shepherds Bush

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

What do kitchen-diner knock-throughs cost in Shepherds Bush?

As a guide, budget £3,200–£7,700 including VAT for kitchen-diner knock-through in Shepherds Bush, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Kitchen-diner knock-through£3,200–£7,700Internal structural wall between kitchen and dining room, steel beam, approvals and making good (kitchen fitting extra)
Load-bearing wall removal with steel beam£2,550–£6,400Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Structural calculations for a beam£320–£960Site measure or photos, beam and padstone design and calculations for building control
Plastering and making good£380–£1,540Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Building control and neighbours in Shepherds Bush

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Kitchen-diner knock-throughs near Shepherds Bush

Local questions answered

What happens at the survey visit in Shepherds Bush?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Do you also work near Shepherds Bush?

Yes. We also cover nearby towns including Notting Hill, Chiswick, Fulham and Willesden.

How long will I be without a kitchen?

The structural work itself usually takes three to six working days, and the kitchen is out of action during that time. After that come plastering, drying, flooring and the kitchen fit, so the overall period without a finished kitchen depends mostly on your fitter's programme and when the units are delivered.

Who moves the gas pipe for my cooker?

A Gas Safe registered engineer, because work on gas pipework must legally be done by one. If the pipe runs in or near the wall being removed, it is capped or rerouted before demolition starts and reconnected once the new layout is in place. We build this into the programme so it is not left to chance.

Do I need building regulations for a kitchen-diner knock-through?

Yes, if the wall is structural. In England it needs building regulations approval through a full plans application or a building notice, in Wales an application under the Welsh regulations, and electrics and any change to fire escape routes are checked too. Scotland requires a building warrant before work starts, and Northern Ireland requires an application to council building control. We handle the application or notice.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.