Steel BeamInstallers
Steel column with a bolted base plate on a concrete pad supporting a beam

Steel columns & posts · Devon

Steel columns & posts in Devon

Survey, engineer's design and installation of steel columns & posts anywhere in Devon.

  • Survey, design and installation in one
  • Covering EX1, EX10, EX11, EX12
  • Inspected before it is covered

Free survey in Devon

Tell us about your steel columns & posts project in Devon.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our steel columns & posts service in Devon

A steel column is an upright structural element that collects the load from a beam, floor or roof and carries it down to a foundation. In homes it is usually a square or circular hollow section or a universal column, welded to a base plate fixed to a concrete pad, and sized by a structural engineer for the load it carries.

We carry out steel columns & posts throughout Devon, for homeowners, landlords and builders who need the structural part done properly. Towns we cover include Tiverton, Paignton and Plymouth, among other places in the area. You get an itemised written quote that shows the calculations, approvals, steel, labour and finishing as separate lines.

Things to plan for

  • Underfloor heating pipes, drains and cables in the slab can sit right where a pad is wanted. These are traced before cutting, and the column position is adjusted where possible rather than damaging a heating loop or drain run.
  • Steel at floor level can corrode if it sits in damp. The detail at the base is designed to keep damp away, using grout, protective paint and the floor's damp-proof membrane, and a column in a cellar or garage may need a heavier coating.
  • The noisiest part is cutting the floor and digging the pad, usually a day's work. The concrete then needs time to gain strength, so the column is often fitted on a later visit once it has cured enough to take load.
  • Hollow sections, either square or circular, give a neat, slim profile and are common where a post stays on show. Universal columns have an H-shaped section and are often used where the post will be boxed in or built into a wall.
  • Older properties sometimes have cast iron columns, timber posts or brick piers doing this job, especially in cellars and former shops. Their condition and capacity are often unknown, so the engineer assesses whether they can stay or need replacing with new steel.

From survey to sign-off in Devon

  1. Free visit

    A short visit to Devon to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

How much should I budget in Devon?

As a guide, budget £520–£1,540 per column including VAT for steel column or post in Devon, based on published UK cost guides adjusted for prices in the South West (+3%).

JobTypical guide rangeWhat it usually covers
Steel column or post£520–£1,540 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Basement or cellar steelwork£2,600–£6,700Beams and columns with pad foundations under the floor above (excavation and waterproofing extra)
Structural calculations for a beam£260–£770Site measure or photos, beam and padstone design and calculations for building control
RSJ supply and fit (single beam)£820–£2,580 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)

Figures include our approximate regional adjustment for prices in the South West (+3%) and are rounded. How these figures are worked out.

Approvals in Devon

Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Local questions answered

Do you cover Devon for steel columns & posts?

Yes. We carry out steel columns & posts in Devon. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Do I need a party wall agreement for steel columns & posts in Devon?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Will a column interfere with underfloor heating?

It can, because the pad has to be dug through the floor where pipes may run. We trace heating loops, drains and cables before cutting and, where possible, move the column position slightly to miss them. If a loop has to be cut, it is repaired and pressure tested by a heating engineer before the floor is reinstated.

Can you replace an old timber or cast iron post?

Usually, yes. Old posts in cellars, garages and converted shops are often undersized, rotten or of unknown strength. The engineer assesses the load they carry and specifies a new steel column and pad. The structure is propped while the old post comes out, and the new column is packed tight before the props are removed.

Can a steel column be left exposed?

Yes, many people leave a column on show, painted to suit the room. In homes exposed steel commonly needs fire protection, often intumescent paint applied to the specified thickness as part of a compatible paint system. Building control checks the protection meets what was specified. Boxing in with fire-rated plasterboard is the alternative where a hidden column is preferred.

Can a steel post replace a supporting wall?

Yes, in many layouts a wall can come out with a beam above it and one or more posts taking the beam's load down to the ground. This keeps most of the openness while shortening the span. The engineer decides how many posts are needed and where they can go.

Can you work on older or listed homes in Devon?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.