Steel BeamInstallers
Steel column with a bolted base plate on a concrete pad supporting a beam

Steel columns & posts · Ely

Steel columns & posts in Ely

Steel columns & posts in Ely, from free survey to completion certificate.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Ely and nearby

Free survey in Ely

Tell us about the steel columns & post job in Ely.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning steel columns & posts in Ely

Need steel columns & posts in Ely? Our coverage runs across Cambridgeshire, so nearby villages are included too. We survey the property, arrange the engineer's design, deal with local building control, fit the steel and make good, all under one quote for CB6 addresses.

We arrange the engineer's design, building control, the pad foundation, propping, supply and fixing of the column, and the boxing or finishing afterwards. You receive an itemised written quote, and the price is fixed in writing once the position, specification and scope are agreed.

Key points for your project

  • Hollow sections, either square or circular, give a neat, slim profile and are common where a post stays on show. Universal columns have an H-shaped section and are often used where the post will be boxed in or built into a wall.
  • A post is needed when a beam has nothing adequate to bear on, or when a span is long enough that a central support gives a shallower, lighter beam. The engineer weighs up a column against a deeper beam for each layout.
  • Columns on upper floors cannot simply stand on joists. The load has to be traced down through the building to the ground, which can mean a column directly below, a beam to collect it, or a redesign of the layout.
  • Steel at floor level can corrode if it sits in damp. The detail at the base is designed to keep damp away, using grout, protective paint and the floor's damp-proof membrane, and a column in a cellar or garage may need a heavier coating.
  • Exposed columns are commonly protected with intumescent paint applied to the thickness the specification calls for, which keeps a slim profile. Boxed columns are clad in fire-rated plasterboard and finished with corner beads, skim and a skirting to match the room.

What happens, step by step

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

Guide prices for steel columns & posts in Ely

As a guide, budget £530–£1,590 per column including VAT for steel column or post in Ely, based on published UK cost guides adjusted for prices in the East of England (+6%).

JobTypical guide rangeWhat it usually covers
Steel column or post£530–£1,590 per columnColumn supplied and fitted with base and cap plates on a pad foundation
RSJ supply and fit (single beam)£850–£2,650 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Basement or cellar steelwork£2,650–£6,900Beams and columns with pad foundations under the floor above (excavation and waterproofing extra)
Structural calculations for a beam£260–£800Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for prices in the East of England (+6%) and are rounded. How these figures are worked out.

Approvals in Ely

For Ely, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Steel columns & posts near Ely

Steel columns & posts in Ely: your questions

Can I stay at home while the work is done in Ely?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Do I need a party wall agreement for steel columns & posts in Ely?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Can a steel column be left exposed?

Yes, many people leave a column on show, painted to suit the room. In homes exposed steel commonly needs fire protection, often intumescent paint applied to the specified thickness as part of a compatible paint system. Building control checks the protection meets what was specified. Boxing in with fire-rated plasterboard is the alternative where a hidden column is preferred.

Do I need building control for a steel column?

Yes. A new structural column is building work under the building regulations in England and Wales, and needs a building warrant first in Scotland and a building control application in Northern Ireland. Inspectors normally check the foundation excavation and the fixed column before it is covered. We deal with the application, notices and inspection visits.

How long does it take to fit a steel post?

The column itself can often be fixed in a day, but the whole job usually spans a few working days. The floor is cut and the pad dug, building control inspects it, the concrete is poured and left to cure, and then the column goes in and is packed tight to the beam.

Do you cover Ely for steel columns & posts?

Yes. We carry out steel columns & posts in Ely and the CB6 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.