Steel BeamInstallers
Steel column with a bolted base plate on a concrete pad supporting a beam

Steel columns & posts · Cambridgeshire

Steel columns & posts in Cambridgeshire

Steel columns & posts across Cambridgeshire, designed by a structural engineer and signed off by building control.

  • Survey, design and installation in one
  • Covering CB1, CB2, CB21, CB22
  • Inspected before it is covered

Free survey in Cambridgeshire

Tell us about your steel columns & posts project in Cambridgeshire.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Steel columns & posts in Cambridgeshire: how it works

A steel column is an upright structural element that collects the load from a beam, floor or roof and carries it down to a foundation. In homes it is usually a square or circular hollow section or a universal column, welded to a base plate fixed to a concrete pad, and sized by a structural engineer for the load it carries.

We carry out steel columns & posts throughout Cambridgeshire, for homeowners, landlords and builders who need the structural part done properly. Towns we cover include Wisbech, Huntingdon and March, among other places in the area. You get an itemised written quote that shows the calculations, approvals, steel, labour and finishing as separate lines.

What to expect

  • Older properties sometimes have cast iron columns, timber posts or brick piers doing this job, especially in cellars and former shops. Their condition and capacity are often unknown, so the engineer assesses whether they can stay or need replacing with new steel.
  • Underfloor heating pipes, drains and cables in the slab can sit right where a pad is wanted. These are traced before cutting, and the column position is adjusted where possible rather than damaging a heating loop or drain run.
  • A column delivers its load to the ground through a small area, so it normally stands on a concrete pad foundation rather than straight onto a floor slab. The pad spreads the load into firm ground at a depth set by the engineer.
  • The base plate is welded to the foot of the column and fixed to the pad with holding-down bolts. A cap plate at the top bolts to the beam above, so the two act together and the beam cannot slide off its support.
  • Exposed columns are commonly protected with intumescent paint applied to the thickness the specification calls for, which keeps a slim profile. Boxed columns are clad in fire-rated plasterboard and finished with corner beads, skim and a skirting to match the room.

Four stages, one team

  1. Survey in Cambridgeshire

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

How much should I budget in Cambridgeshire?

As a guide, budget £530–£1,590 per column including VAT for steel column or post in Cambridgeshire, based on published UK cost guides adjusted for prices in the East of England (+6%).

JobTypical guide rangeWhat it usually covers
Steel column or post£530–£1,590 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Basement or cellar steelwork£2,650–£6,900Beams and columns with pad foundations under the floor above (excavation and waterproofing extra)
Steel goalpost frame£2,100–£6,350Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
RSJ supply and fit (single beam)£850–£2,650 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)

Figures include our approximate regional adjustment for prices in the East of England (+6%) and are rounded. How these figures are worked out.

Building control and neighbours in Cambridgeshire

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Steel columns & posts in Cambridgeshire: your questions

Do I need a party wall agreement for steel columns & posts in Cambridgeshire?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Which towns in Cambridgeshire do you cover?

We cover towns including Peterborough, Cambridge, Wisbech and St Neots, plus the villages and smaller towns around them.

How long does it take to fit a steel post?

The column itself can often be fixed in a day, but the whole job usually spans a few working days. The floor is cut and the pad dug, building control inspects it, the concrete is poured and left to cure, and then the column goes in and is packed tight to the beam.

What is the difference between a column and a padstone?

A padstone is a block bedded into a wall to spread a beam's load into the masonry beneath. A column replaces the need for a wall altogether, carrying the load down to its own foundation. Where the wall below a beam end is too weak for a padstone, the engineer may call for a column instead.

Can you replace an old timber or cast iron post?

Usually, yes. Old posts in cellars, garages and converted shops are often undersized, rotten or of unknown strength. The engineer assesses the load they carry and specifies a new steel column and pad. The structure is propped while the old post comes out, and the new column is packed tight before the props are removed.

Can I put a steel post in the middle of a beam?

Yes, a central post is a common way to support a long beam, and it often lets the engineer specify a shallower steel. The post needs its own foundation and has to sit somewhere that works with the room layout. The engineer compares a post against a single deeper beam and specifies whichever suits the loads and the space.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.