Steel BeamInstallers
Victorian side return extension with grey steel beams and roof rafters

Side return extension steels · Berkshire

Side return extension steels in Berkshire

Side return extension steels across Berkshire, designed by a structural engineer and signed off by building control.

  • Survey, design and installation in one
  • Covering GU47, RG1, RG10, RG12
  • Inspected before it is covered

Free survey in Berkshire

Tell us about your side return extension steels project in Berkshire.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Side return extension steels in Berkshire: how it works

Side return extension steels are the beams and columns that replace the side wall of a terraced house's rear wing when the narrow passage beside it is built over. Sized by a structural engineer, they carry the wall, floor and roof loads above along the line of the old wall, so the kitchen and the infilled side return become one wide room.

Homes across Berkshire range from Victorian terraces to post-war semis and newer estates, and side return extension steels look different in each. That includes Sandhurst, Maidenhead and Wokingham, plus smaller towns and villages nearby. We plan the steel, the temporary support and the approvals around the building, then fix the price in writing once the scope is agreed.

What to expect

  • Many outrigger kitchens have a chimney breast on the side wall being removed or on the party wall. Its position affects where beams can bear, and if any part of the breast is taken out, what remains above has to be supported as the engineer specifies.
  • Victorian outrigger walls are often a single brick thick in soft lime mortar, sometimes on very shallow footings. The engineer may ask for trial holes before deciding whether new foundations are needed under the column positions or beam ends.
  • The kitchen is usually out of use while the side wall comes down and the frame goes in, so many households set up a temporary kitchen elsewhere in the house. The rest of the property normally stays in use throughout the steel stage.
  • Propping a side return is awkward because space in a narrow kitchen is tight and the infill side is often open ground. Props outside may stand on temporary pads or boards, set so they do not sink or shift in wet weather.
  • Some owners leave the long beam on show as a feature under a glazed roof. Exposed steel still needs fire protection where building control requires it, which usually means a specified intumescent paint system applied to the correct thickness.

What happens, step by step

  1. Free visit

    A short visit to Berkshire to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

Guide prices for side return extension steels in Berkshire

As a guide, budget £3,900–£9,500 including VAT for side return extension steelwork in Berkshire, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Side return extension steelwork£3,900–£9,500Beams and posts along the old side wall line, propping and approvals (extension build extra)
Temporary works and propping£170–£560Props, spreaders, needles and sole plates for a typical opening, installed and struck
Fire protection to a steel beam£170–£670 per beamFire-rated board boxing or an intumescent coating system as specified
Steel column or post£560–£1,680 per columnColumn supplied and fitted with base and cap plates on a pad foundation

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Approvals in Berkshire

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Local questions answered

Can I stay at home while the work is done in Berkshire?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Do you cover Berkshire for side return extension steels?

Yes. We carry out side return extension steels in Berkshire. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Do I need planning permission for a side return extension?

It depends on the house and where it is. Some side return infills can be built under permitted development, but the rules for side extensions are restrictive, and conservation areas and listed buildings add further controls. Check with your local planning authority or architect before committing to a design.

What steels do I need for a side return extension?

Usually a long beam along the line of the old outrigger side wall, often a second beam opening the back of the main house, and one or more columns where the loads meet. The exact arrangement depends on the house and the layout, and a structural engineer specifies every beam, column and connection.

Can the steel beam be left exposed in a side return?

Yes, and many people like the look of exposed steel under a glazed roof. It usually still needs fire protection, so it is coated with an intumescent paint system to the specified thickness, then finished in your chosen colour. The engineer and building control confirm what protection is required.

Can the outrigger wall be removed without affecting the bathroom above?

Yes, when it is properly propped and replaced with steel designed for the load. The floor and wall above are supported throughout, and the bathroom stays usable in most cases. Waste pipes or soil stacks on the wall being removed are rerouted first so nothing is disturbed when it comes down.

Can you work on older or listed homes in Berkshire?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.