Steel BeamInstallers
Victorian side return extension with grey steel beams and roof rafters

Side return extension steels · Slough

Side return extension steels in Slough

Steelwork, approvals and making good for side return extension steels in Slough and nearby.

  • Survey, design and installation in one
  • Covering SL1, SL2, SL3
  • Inspected before it is covered

Free survey in Slough

Tell us about the side return extension steel job in Slough.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning side return extension steels in Slough

Our side return extension steels service in Slough covers everything from the first visit to the completion paperwork. Our coverage runs across Berkshire, so nearby villages are included too. Postcode districts we cover here include SL1, SL2 and SL3.

Side returns tend to need more steel than a straight rear extension: a long beam on the old wall line, often a second beam across the back of the main house, and columns where they meet. We arrange the design, approvals and party wall notices through a surveyor, and fit the steel frame in step with the build.

Key points for your project

  • Bathrooms above outriggers are common, and their floors carry baths, tiles and water. The engineer allows for those loads, and any soil pipe or waste running down the side wall is rerouted before the wall comes out.
  • Many outrigger kitchens have a chimney breast on the side wall being removed or on the party wall. Its position affects where beams can bear, and if any part of the breast is taken out, what remains above has to be supported as the engineer specifies.
  • Glazed roofs over side returns are usually made to measure and need an edge that stays straight and level. The engineer may set a stiffer limit on how far the steel can deflect so the glazing is not stressed once loaded.
  • Victorian outrigger walls are often a single brick thick in soft lime mortar, sometimes on very shallow footings. The engineer may ask for trial holes before deciding whether new foundations are needed under the column positions or beam ends.
  • Side passages often carry the house drains and rainwater pipes from the outrigger roof. Manholes and pipe runs are located early, and a shared or public sewer under the passage may need the water company's agreement before building over or near it.

Four stages, one team

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to Slough Borough Council, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

Guide prices for side return extension steels in Slough

As a guide, budget £3,900–£9,500 including VAT for side return extension steelwork in Slough, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Side return extension steelwork£3,900–£9,500Beams and posts along the old side wall line, propping and approvals (extension build extra)
Opening into a rear extension£2,800–£7,850Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Temporary works and propping£170–£560Props, spreaders, needles and sole plates for a typical opening, installed and struck
Fire protection to a steel beam£170–£670 per beamFire-rated board boxing or an intumescent coating system as specified

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building rules for Slough

Structural openings in English homes need building regulations approval before work starts. Slough Borough Council can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Side return extension steels near Slough

Local questions answered

Do you also work near Slough?

Yes. We also cover nearby towns including Windsor, Maidenhead, Gerrards Cross and Uxbridge.

What happens at the survey visit in Slough?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Do I need planning permission for a side return extension?

It depends on the house and where it is. Some side return infills can be built under permitted development, but the rules for side extensions are restrictive, and conservation areas and listed buildings add further controls. Check with your local planning authority or architect before committing to a design.

Can the outrigger wall be removed without affecting the bathroom above?

Yes, when it is properly propped and replaced with steel designed for the load. The floor and wall above are supported throughout, and the bathroom stays usable in most cases. Waste pipes or soil stacks on the wall being removed are rerouted first so nothing is disturbed when it comes down.

How long does it take to fit side return steels?

Most side return steel frames take two to five working days on site, depending on the number of beams and columns and how easy access is. That covers propping, removing the old side wall, fitting the steels and packing them. Fire protection and finishes follow afterwards.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.