
Rear extension steels · Craigavon
Rear extension steels in Craigavon
Rear extension steels in Craigavon, from free survey to completion certificate.
- Survey, design and installation in one
- Covering BT63, BT64, BT65
- Inspected before it is covered
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
About our rear extension steels service in Craigavon
Our rear extension steels service in Craigavon covers everything from the first visit to the completion paperwork. The wider Armagh City, Banbridge and Craigavon area is covered as well. Postcode districts we cover here include BT63, BT64, BT65 and BT66.
Building a rear extension is only half of the open-plan result. The original back wall still holds up the first floor and the rear wall of the bedrooms above, so opening it needs steel. Depending on the width and what is left to bear on, that could be a single beam on padstones, a beam on columns, or a full goalpost frame.
Key points for your project
- A single beam works where solid masonry is left at both ends of the opening. Where the opening runs nearly the full width or the corners are weak, the engineer may use columns or a goalpost frame, which is two posts and a beam bolted together.
- The building control completion certificate for the extension covers the steelwork to the old rear wall. Keep it with the engineer's calculations and drawings, as a buyer's solicitor will expect to see the structural paperwork for the extension.
- Two-storey rear extensions add a second level of loads to think about. Steels at first-floor level may carry the existing rear wall of the bedrooms or tie the new roof into the old one, so the engineer looks at both floors together.
- During the opening, props stand both inside the house and within the extension footprint. Where props bear on a newly laid slab, the propping plan checks that the slab can take those point loads, using spreaders where needed.
- In older houses the rear wall may be solid brick in lime mortar, with timber lintels and shallow footings beneath. The engineer may ask for trial holes to see what the wall stands on before deciding where the steel will bear.
From survey to sign-off in Craigavon
Look and measure
We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.
Design and price
Calculations come back from the engineer and we confirm your fixed written price, line by line.
Building control
A full plans application or building notice goes to Armagh City, Banbridge and Craigavon Borough Council under the Building Regulations (Northern Ireland) 2012 before work begins.
Fit, inspect, finish
The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.
What do rear extension steels cost in Craigavon?
As a guide, budget £2,150–£6,000 including VAT for opening into a rear extension in Craigavon, based on published UK cost guides adjusted for prices in Northern Ireland (-14%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Opening into a rear extension | £2,150–£6,000 | Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build |
| Steel column or post | £430–£1,290 per column | Column supplied and fitted with base and cap plates on a pad foundation |
| Steel goalpost frame | £1,700–£5,150 | Two posts and a beam bolted as a frame, pad foundations, base plates and fitting |
Figures include our approximate regional adjustment for prices in Northern Ireland (-14%) and are rounded. How these figures are worked out.
Approvals in Craigavon
Removing a load-bearing wall in Northern Ireland needs building control approval from the council. Armagh City, Banbridge and Craigavon Borough Council covers Craigavon. The engineer's calculations support the application, and a completion certificate is issued after the final inspection.
Northern Ireland has no Party Wall Act, so there is no statutory notice to serve. Where the steel bears into a shared wall, the title deeds and the general law apply, and agreeing the work with your neighbour in writing first is good practice.
Questions about rear extension steels in Craigavon
Who approves rear extension steels in Craigavon?
Structural work in Craigavon needs a full plans application or building notice to Armagh City, Banbridge and Craigavon Borough Council. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.
Do you cover Craigavon for rear extension steels?
Yes. We carry out rear extension steels in Craigavon and the BT63, BT64, BT65 and BT66 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.
Who designs the steels for a rear extension?
A structural engineer. Your architect's drawings show the layout, but the engineer calculates the beams, columns, connections and foundations. We arrange those calculations, or work from an engineer's design you already have, and make sure the details suit the builder's programme.
Can I use my own builder for the extension and you for the steels?
Yes. We can supply and fit the steel package while another builder handles the extension shell and finishes. Dates are agreed with them so the rear wall is opened at the right stage, and the engineer's details are shared so levels, padstones and foundations line up.
Will my kitchen be out of action while the rear wall is opened?
For a few days, usually. The kitchen often sits against the rear wall, so units, sinks or appliances near the opening may need disconnecting while the wall is propped and removed. The work area is sheeted off and the rest of the house stays in use.
Can you work on older or listed homes in Craigavon?
Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.