Steel BeamInstallers
Brickwork propped above a window while a cracked lintel is replaced

Lintel replacement · Leigh

Lintel replacement in Leigh

Lintel replacement for homes in M29, M46, WN7, designed by a structural engineer.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Leigh and nearby

Free survey in Leigh

Tell us about the lintel replacement job in Leigh.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What lintel replacement involves in Leigh

If you live in Leigh, lintel replacement can usually be planned and priced after a single survey visit. We also work in nearby Wigan, roughly 5.8 miles away. We cover M29, M46 and WN7, and we fix the price in writing once the layout and scope are agreed.

We survey the opening, arrange the engineer's specification and building control, prop the wall, swap the lintel and rebuild the masonry and plaster around it. Your quote is written and itemised, and it covers matching the bricks and mortar as closely as the existing wall allows.

Things to plan for

  • Windows and doors can often stay in place during a lintel replacement, keeping the house secure and weathertight. Where a frame has been carrying sagging brickwork for some time, it may need adjusting or replacing once the new lintel takes the load.
  • Replacing a structural lintel is generally treated as building work, so approval is in place before it starts. In England, Wales and Northern Ireland that means building control, and in Scotland a building warrant is needed before structural work begins.
  • Bricks taken down are cleaned and reused where possible, and any shortfall is made up with reclaimed or close-matching bricks. Mortar is mixed to suit the colour and strength of the existing wall, which in older homes often means a lime mortar.
  • The replacement is specified by a structural engineer, who looks at the opening width, the wall construction and what the lintel carries, such as floor joists, a bay roof or a gable. Solid walls and cavity walls usually call for different lintel types.
  • Older steel lintels and bare steel angles can corrode where water sits on them. Rust takes up more room than the steel it comes from, so a corroding lintel can lift the brick course above it and open up horizontal cracks.

How the job runs in Leigh

  1. Free visit

    A short visit to Leigh to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to Wigan Council, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

What does lintel replacement cost in Leigh?

As a guide, budget £380–£1,150 per lintel including VAT for lintel replacement in Leigh, based on published UK cost guides adjusted for prices in the North West (-4%).

JobTypical guide rangeWhat it usually covers
Lintel replacement£380–£1,150 per lintelPropping, removing the old lintel, new lintel set on beds and brickwork made good
Rear wall opening for bi-fold or sliding doors£2,400–£6,700External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
Plastering and making good£290–£1,150Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
Steel beam replacement£1,900–£5,300Propping, removing the failed beam, new steel on proper bearings, approval and making good

Figures include our approximate regional adjustment for prices in the North West (-4%) and are rounded. How these figures are worked out.

Building control and neighbours in Leigh

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Wigan Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Lintel replacement near Leigh

Local questions answered

What happens at the survey visit in Leigh?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Do I need a party wall agreement for lintel replacement in Leigh?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Can a lintel be replaced without removing the window?

Often, yes. The brickwork above is propped, the old lintel is taken out and the new one fitted while the frame stays in place under protection. If the frame has been carrying weight because the old lintel sagged, it may need easing or adjusting once the new lintel is in.

Do I need scaffolding to replace a lintel?

For ground-floor windows and doors, usually not, as props and a stable platform from the ground are enough. First-floor and higher openings normally need scaffolding or a tower so the brickwork can be rebuilt safely, and that cost appears as its own line in the quote.

Is a cracked lintel dangerous?

It can become a problem if left, because the masonry above loses support and cracks tend to widen as it settles. Failure is usually gradual, but if bricks are loose, a frame is distorting or cracks are growing quickly, have it checked promptly and keep people clear of the area.

Can I stay at home while the work is done in Leigh?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.