Steel BeamInstallers
Victorian house mid-conversion into flats with new steel beams and stud walls

Flat & HMO conversion steels · Felling

Flat & HMO conversion steels in Felling

Flat & HMO conversion steels for homes in NE8, NE9, NE10, designed by a structural engineer.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Felling and nearby

Free survey in Felling

Tell us about the flat & HMO conversion steel job in Felling.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What flat & HMO conversion steels involve in Felling

We cover flat & HMO conversion steels in Felling (NE8, NE9, NE10) and the streets around it. Felling is around 2.2 miles from Newcastle upon Tyne, and we cover both. Each job is designed by a structural engineer and approved through Gateshead Council before work begins.

We supply and install steelwork for landlords, developers and their builders, working from the engineer's design and fitting in with the wider conversion. We arrange structural calculations, handle building control for the structural work or feed into your existing application, and fire protect the steel to the period the scheme requires.

Things to plan for

  • Where the building is leasehold, or an existing flat is being altered, the freeholder's written consent is normally needed for structural changes. Lenders may also want to see building control sign-off before releasing funds on a converted property.
  • In a conversion, walls that carried load are often taken out to form open kitchens or wider corridors, while new partitions go in elsewhere. Each change is checked, because a new stud wall standing on old joists can add load the floor was never designed for.
  • The engineer looks at the whole building rather than one opening at a time. Loads from upper floors, new bathrooms and water storage are traced down to the foundations, and steel is placed so it suits the new layout without awkward downstands in habitable rooms.
  • A conversion to flats or an HMO may need planning permission for the change of use, depending on the scheme, its size and any local restrictions. Checking the planning position before design work begins avoids redesigning the layout and its steel later.
  • Separating floors and walls also have to meet sound insulation standards. Steel connections and boxing are detailed so they do not leave gaps or rigid paths for noise, and sound testing near completion checks that the separating construction performs.

What happens, step by step

  1. Survey in Felling

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to Gateshead Council, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

How much should I budget in Felling?

As a guide, budget £2,300–£8,350 including VAT for steelwork for a flat or HMO conversion in Felling, based on published UK cost guides adjusted for prices in the North East (-7%).

JobTypical guide rangeWhat it usually covers
Steelwork for a flat or HMO conversion£2,300–£8,350Beams and posts for a revised layout, with approvals; fire and sound separation priced with the conversion
Structural calculations for a beam£230–£700Site measure or photos, beam and padstone design and calculations for building control
Fire protection to a steel beam£140–£560 per beamFire-rated board boxing or an intumescent coating system as specified
Steel column or post£460–£1,400 per columnColumn supplied and fitted with base and cap plates on a pad foundation

Figures include our approximate regional adjustment for prices in the North East (-7%) and are rounded. How these figures are worked out.

Approvals in Felling

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Gateshead Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Flat & HMO conversion steels near Felling

Local questions answered

Do I need a party wall agreement for flat & HMO conversion steels in Felling?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Can you work on older or listed homes in Felling?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Do I need building regulations to convert a house into flats?

Yes. Converting a house into flats is a material change of use, so the building has to meet requirements for fire safety, sound insulation, structure and other matters. In England and Wales that means a building control application, in Scotland a building warrant before work starts, and in Northern Ireland an application to council building control.

How long does the steelwork take on a house-to-flats conversion?

Typically one to three weeks on site, depending on how many walls move and how the work is phased. The steel is usually among the first structural stages, so it is programmed early to let partitions, services and fire separation follow. The full conversion takes considerably longer than the steelwork alone.

Does steel in a flat conversion need fire protection?

Yes, in almost all cases. Steel holding up floors that separate flats, or supporting escape routes, needs fire resistance to the period the scheme requires, which can be higher than in a single house. It is usually boxed with fire-rated board or coated with intumescent paint, and building control inspects it before handover.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.