Fire protection for steel beams · Felling
Fire protection for steel beams in Felling
Fire protection for steel beams in Felling, from free survey to completion certificate.
- Price fixed in writing once scope is agreed
- Building control arranged
- Temporary works and making good included
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
What fire protection for steel beams involves in Felling
Planning fire protection for steel beams in Felling? Our team covers NE8, NE9, NE10 and NE11 and the streets around them. It sits about 2.2 miles from Newcastle upon Tyne, which we also cover. You get one written quote for the calculations, approvals, propping, steel and making good.
We fit fire protection alongside new steelwork, and as a standalone job where steel was installed without it or building control has asked for more. That covers boxing with fire-rated plasterboard, intumescent coatings for steel left on show, and the records building control needs to see before signing the work off.
Worth knowing before you start
- Fire-rated plasterboard is denser than standard board and contains additives that slow the passage of heat. It usually has a pink or red face, and the number of layers and fixing pattern come from the system specification rather than being decided on site.
- Fire boarding should not be cut into casually later on. Downlights, cables and pipes pushed through the boxing can weaken it, so services are planned before boarding, and any openings are sealed with suitable fire-stopping materials.
- Older homes sometimes have steel fitted decades ago with no protection at all, or boxed in ordinary timber and hardboard. When this turns up during other work, we can check what is there and price protection to suit today's requirements.
- Keep a record of what was fitted: the board type and number of layers, or the coating product, thickness readings and number of coats. Building control may ask for it, and it helps answer queries when the house is sold.
- Intumescent paint looks like an ordinary coating but swells into a thick insulating char when heated. How well it performs depends on the dry film thickness, which varies with the steel section and fire period, so it is applied to a written specification.
Four stages, one team
Free visit
A short visit to Felling to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to Gateshead Council, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
Guide prices for fire protection for steel beams in Felling
As a guide, budget £140–£560 per beam including VAT for fire protection to a steel beam in Felling, based on published UK cost guides adjusted for prices in the North East (-7%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Fire protection to a steel beam | £140–£560 per beam | Fire-rated board boxing or an intumescent coating system as specified |
| RSJ supply and fit (single beam) | £740–£2,320 per beam | Beam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately) |
| Steel beam replacement | £1,850–£5,100 | Propping, removing the failed beam, new steel on proper bearings, approval and making good |
| Structural calculations for a beam | £230–£700 | Site measure or photos, beam and padstone design and calculations for building control |
Figures include our approximate regional adjustment for prices in the North East (-7%) and are rounded. How these figures are worked out.
Building rules for Felling
Structural openings in English homes need building regulations approval before work starts. Gateshead Council can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Local questions answered
Do you also work near Felling?
Yes. We also cover nearby towns including Gateshead, Newcastle upon Tyne, Hebburn and Wallsend.
How much does fire protection for steel beams cost in Felling?
As a guide, budget £140–£560 per beam including VAT for fire protection to a steel beam in Felling, based on published UK cost guides adjusted for prices in the North East (-7%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.
What is intumescent paint for steel beams?
Intumescent paint is a fire-protective coating that swells when heated, forming a thick insulating layer that slows the steel heating up. It lets you leave a beam on show while still meeting fire requirements. It must be applied at a specified thickness over a compatible primer, so it goes on to a written specification rather than like ordinary paint.
Does a steel column need fire protection as well as the beam?
Usually, if the column is part of the load path. A column carrying a beam is just as important in a fire, so it normally needs the same fire resistance. Columns are often boxed with board or coated with intumescent paint, and the engineer's design and building control confirm what applies to yours.
Does a steel beam in a house need fire protection?
Usually, yes. Where a steel beam or column holds up part of the structure, building regulations normally require it to resist fire for a set period, commonly 30 minutes in a typical house. Building control confirms what is needed for your property, and the protection is checked before the work is signed off.
Who approves fire protection for steel beams in Felling?
Structural work in Felling needs a building notice or full plans application to Gateshead Council or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.