Fire protection for steel beams · Pimlico

Fire protection for steel beams in Pimlico

Fire protection for steel beams for homes in SW1, W1, WC2, designed by a structural engineer.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Pimlico

Tell us about the fire protection for steel beams job in Pimlico.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning fire protection for steel beams in Pimlico

We carry out fire protection for steel beams in Pimlico, covering the SW1, W1 and WC2 postcode districts. The wider London area is covered as well. The job starts with a free survey visit so the engineer's calculations are based on your actual walls, floors and loads.

We fit fire protection alongside new steelwork, and as a standalone job where steel was installed without it or building control has asked for more. That covers boxing with fire-rated plasterboard, intumescent coatings for steel left on show, and the records building control needs to see before signing the work off.

Worth knowing before you start

  • Boxing a single beam usually takes around a day, plus skimming and drying. Intumescent coatings need each coat to dry before the next goes on, so they can take several days depending on the thickness required and the room temperature.
  • Fire-rated plasterboard is denser than standard board and contains additives that slow the passage of heat. It usually has a pink or red face, and the number of layers and fixing pattern come from the system specification rather than being decided on site.
  • Boarding is fairly clean work, but coatings need a clean, dry and well-ventilated room at a suitable temperature. Dust from other trades can spoil the surface, so painting is normally scheduled once the messy work in that room is finished.
  • Boxing is generally the lower-cost route for steel that will be hidden. Intumescent coatings cost more because of the product and the number of coats, and the price rises with the fire period and the size of the section.
  • Keep a record of what was fitted: the board type and number of layers, or the coating product, thickness readings and number of coats. Building control may ask for it, and it helps answer queries when the house is sold.

From survey to sign-off in Pimlico

  1. Free visit

    A short visit to Pimlico to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

What does fire protection for steel beams cost in Pimlico?

As a guide, budget £190–£770 per beam including VAT for fire protection to a steel beam in Pimlico, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Fire protection to a steel beam£190–£770 per beamFire-rated board boxing or an intumescent coating system as specified
Steel column or post£640–£1,920 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Building control fees£320–£830Building notice or full plans fee and inspections; varies by council or approver
Plastering and making good£380–£1,540Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Building control and neighbours in Pimlico

For Pimlico, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Fire protection for steel beams near Pimlico

Local questions answered

Can I stay at home while the work is done in Pimlico?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

What happens at the survey visit in Pimlico?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

My steel beam was fitted years ago without fire protection. What should I do?

Have it looked at and protected to current requirements. Unprotected steel can raise questions when you sell, and if the original work was never approved, a regularisation application to building control may be needed in England and Wales. We can survey the steel and price both the protection and the paperwork route.

What is intumescent paint for steel beams?

Intumescent paint is a fire-protective coating that swells when heated, forming a thick insulating layer that slows the steel heating up. It lets you leave a beam on show while still meeting fire requirements. It must be applied at a specified thickness over a compatible primer, so it goes on to a written specification rather than like ordinary paint.

Is boxing in a steel beam cheaper than intumescent paint?

Usually, yes. Boxing with fire-rated plasterboard tends to cost less for steel that will be hidden. Intumescent coatings generally cost more because of the product and the number of coats needed, but they let the beam stay visible. Where either method would work, both can be priced on the itemised quote so you can compare.

How much does fire protection for steel beams cost in Pimlico?

As a guide, budget £190–£770 per beam including VAT for fire protection to a steel beam in Pimlico, based on published UK cost guides adjusted for London prices (+28%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.