Steel BeamInstallers
Steel beam half boxed in pink fire-rated plasterboard

Fire protection for steel beams · Holloway

Fire protection for steel beams in Holloway

Steelwork, approvals and making good for fire protection for steel beams in Holloway and nearby.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Holloway

Tell us about the fire protection for steel beams job in Holloway.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our fire protection for steel beams service in Holloway

Planning fire protection for steel beams in Holloway? Our team covers N1, N1C, N5, N6 and N7 and the streets around them. The wider London area is covered as well. You get one written quote for the calculations, approvals, propping, steel and making good.

We fit fire protection alongside new steelwork, and as a standalone job where steel was installed without it or building control has asked for more. That covers boxing with fire-rated plasterboard, intumescent coatings for steel left on show, and the records building control needs to see before signing the work off.

What to expect

  • Intumescent paint looks like an ordinary coating but swells into a thick insulating char when heated. How well it performs depends on the dry film thickness, which varies with the steel section and fire period, so it is applied to a written specification.
  • Boxing is generally the lower-cost route for steel that will be hidden. Intumescent coatings cost more because of the product and the number of coats, and the price rises with the fire period and the size of the section.
  • Building control treats fire protection as part of the structural approval, not an optional extra. If unprotected steel is found at inspection, the completion certificate is normally held back until the protection is in place and has been checked.
  • Boarding is fairly clean work, but coatings need a clean, dry and well-ventilated room at a suitable temperature. Dust from other trades can spoil the surface, so painting is normally scheduled once the messy work in that room is finished.
  • Damaged boxing or chipped intumescent paint should be repaired properly, not patched with ordinary filler. Small chips in a coating can usually be touched up with the same system, while a dented or holed box may need that board section replaced.

What happens, step by step

  1. Free visit

    A short visit to Holloway to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

Guide prices for fire protection for steel beams in Holloway

As a guide, budget £190–£770 per beam including VAT for fire protection to a steel beam in Holloway, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Fire protection to a steel beam£190–£770 per beamFire-rated board boxing or an intumescent coating system as specified
Steel column or post£640–£1,920 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Steel beam replacement£2,550–£7,050Propping, removing the failed beam, new steel on proper bearings, approval and making good
Structural calculations for a beam£320–£960Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Approvals in Holloway

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Fire protection for steel beams near Holloway

Fire protection for steel beams in Holloway: your questions

How much does fire protection for steel beams cost in Holloway?

As a guide, budget £190–£770 per beam including VAT for fire protection to a steel beam in Holloway, based on published UK cost guides adjusted for London prices (+28%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

How soon can fire protection for steel beams start in Holloway?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Is boxing in a steel beam cheaper than intumescent paint?

Usually, yes. Boxing with fire-rated plasterboard tends to cost less for steel that will be hidden. Intumescent coatings generally cost more because of the product and the number of coats needed, but they let the beam stay visible. Where either method would work, both can be priced on the itemised quote so you can compare.

Can I box in a steel beam with normal plasterboard?

Not where fire protection is required. Standard plasterboard is not designed to protect steel for a set period in a fire. Fire-rated plasterboard is used instead, fixed in the number of layers and with the fixings the system specifies, so the boxing performs as intended and passes when building control checks it.

Does a steel beam in a house need fire protection?

Usually, yes. Where a steel beam or column holds up part of the structure, building regulations normally require it to resist fire for a set period, commonly 30 minutes in a typical house. Building control confirms what is needed for your property, and the protection is checked before the work is signed off.

Do you also work near Holloway?

Yes. We also cover nearby towns including Highbury, Archway, Camden Town and Chalk Farm.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.