Fire protection for steel beams · Skelmersdale
Fire protection for steel beams in Skelmersdale
Fire protection for steel beams for homes in WN8, designed by a structural engineer.
- Free survey visit in Skelmersdale
- Engineer's calculations arranged
- Building control handled for you
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
What fire protection for steel beams involves in Skelmersdale
Skelmersdale has a mix of housing, and fire protection for steel beams needs a slightly different approach in each. We also work in nearby Wigan, roughly 5.6 miles away. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.
A bare steel beam is strong at room temperature but loses much of its load-carrying capacity once it gets hot enough in a fire. If that beam holds up a floor or the walls above, it matters to everyone in the building. Fire protection slows the rate at which the steel heats up, buying time for people to get out safely.
Things to plan for
- Boxing a single beam usually takes around a day, plus skimming and drying. Intumescent coatings need each coat to dry before the next goes on, so they can take several days depending on the thickness required and the room temperature.
- The fire resistance needed depends on the building and where the steel sits. In a typical two-storey house, elements of structure commonly need 30 minutes, but taller homes, flats and commercial premises can need more. The engineer and building control confirm the figure.
- A common fault is applying intumescent paint over the wrong primer, or over one of unknown type. The products must be compatible, so where steel was primed long ago the primer is identified or the surface is cleaned back before coating.
- Boarding is fairly clean work, but coatings need a clean, dry and well-ventilated room at a suitable temperature. Dust from other trades can spoil the surface, so painting is normally scheduled once the messy work in that room is finished.
- Older homes sometimes have steel fitted decades ago with no protection at all, or boxed in ordinary timber and hardboard. When this turns up during other work, we can check what is there and price protection to suit today's requirements.
Four stages, one team
Survey in Skelmersdale
We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.
Engineer's design
A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Install and sign-off
Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.
Guide prices for fire protection for steel beams in Skelmersdale
As a guide, budget £140–£580 per beam including VAT for fire protection to a steel beam in Skelmersdale, based on published UK cost guides adjusted for prices in the North West (-4%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Fire protection to a steel beam | £140–£580 per beam | Fire-rated board boxing or an intumescent coating system as specified |
| RSJ supply and fit (single beam) | £770–£2,400 per beam | Beam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately) |
| Steel column or post | £480–£1,440 per column | Column supplied and fitted with base and cap plates on a pad foundation |
| Steel beam replacement | £1,900–£5,300 | Propping, removing the failed beam, new steel on proper bearings, approval and making good |
Figures include our approximate regional adjustment for prices in the North West (-4%) and are rounded. How these figures are worked out.
Building control and neighbours in Skelmersdale
Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Questions about fire protection for steel beams in Skelmersdale
Do you also work near Skelmersdale?
Yes. We also cover nearby towns including Ormskirk, Wigan, Kirkby and Ashton in Makerfield.
Can you work on older or listed homes in Skelmersdale?
Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.
Can I put downlights in a boxed-in steel beam?
Only with planning. Cutting holes in fire boarding can weaken its protection, so any lights in or near the boxing need to be designed in, using fire-rated fittings or suitable fire-stopping where the board is pierced. It is far easier to sort this out before the boxing goes up than to adapt it afterwards.
My steel beam was fitted years ago without fire protection. What should I do?
Have it looked at and protected to current requirements. Unprotected steel can raise questions when you sell, and if the original work was never approved, a regularisation application to building control may be needed in England and Wales. We can survey the steel and price both the protection and the paperwork route.
Does a steel column need fire protection as well as the beam?
Usually, if the column is part of the load path. A column carrying a beam is just as important in a fire, so it normally needs the same fire resistance. Columns are often boxed with board or coated with intumescent paint, and the engineer's design and building control confirm what applies to yours.
What happens at the survey visit in Skelmersdale?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.