Steel BeamInstallers
Two installers seen from behind lifting a steel beam onto a padstone

RSJ installation · Skelmersdale

RSJ installation in Skelmersdale

RSJ installation for homes in WN8, designed by a structural engineer.

  • Survey, design and installation in one
  • Covering WN8
  • Inspected before it is covered

Free survey in Skelmersdale

Tell us about the RSJ installation job in Skelmersdale.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

RSJ installation in Skelmersdale: how it works

For homes in Skelmersdale and the WN8 district, we handle RSJ installation from survey to sign-off. It sits about 5.6 miles from Wigan, which we also cover. The beam is sized by a structural engineer and inspected before it is boxed in.

People still call almost any steel beam in a house an RSJ, even though the sections fitted today are usually universal beams with parallel flanges. Whatever the name, the job is the same: a length of structural steel, made to an engineer's specification, carrying floors, walls or roof over a space where support used to be.

Things to plan for

  • If you already hold calculations from an architect or engineer, we install to those. Where something on site differs from the drawing, such as a weaker wall or a different joist direction, the engineer is asked to confirm before work carries on.
  • Steel for internal use is normally delivered with a primer coat to protect it during installation. Beams in damp positions, within external walls or exposed outside need a more robust coating or galvanising, as the engineer specifies.
  • Padstones spread the concentrated load from each beam end into the masonry below. They may be concrete, engineering brick or a steel plate, depending on the engineer's design and the strength of the wall beneath.
  • Delivery can make or break an RSJ job. A long beam has to turn through a front door, along a hallway and past the stairs, so routes are measured at the survey and alternatives such as a window opening are planned early.
  • The engineer chooses the section type for the job. Universal beams suit most spans, universal columns are stockier and used as posts or where depth is limited, parallel flange channels fit against walls or timbers, and box sections suit slim or exposed members.

What happens, step by step

  1. Survey in Skelmersdale

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

What does RSJ installation cost in Skelmersdale?

As a guide, budget £770–£2,400 per beam including VAT for rSJ supply and fit (single beam) in Skelmersdale, based on published UK cost guides adjusted for prices in the North West (-4%).

JobTypical guide rangeWhat it usually covers
RSJ supply and fit (single beam)£770–£2,400 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Steel beam replacement£1,900–£5,300Propping, removing the failed beam, new steel on proper bearings, approval and making good
Fire protection to a steel beam£140–£580 per beamFire-rated board boxing or an intumescent coating system as specified
Steel goalpost frame£1,900–£5,750Two posts and a beam bolted as a frame, pad foundations, base plates and fitting

Figures include our approximate regional adjustment for prices in the North West (-4%) and are rounded. How these figures are worked out.

Building control and neighbours in Skelmersdale

Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

RSJ installation near Skelmersdale

Local questions answered

Do I need a party wall agreement for RSJ installation in Skelmersdale?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Can you work on older or listed homes in Skelmersdale?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Who decides what size RSJ I need?

A structural engineer. The size depends on the span, the loads from floors, walls and roof above, how stiff the beam needs to be and how its ends are supported. We arrange calculations from a qualified engineer, or fit to calculations you already have, rather than guessing a size.

Do I need building regulations approval to fit an RSJ?

Yes, when the RSJ carries structural load such as a wall, floor or roof. In England and Wales building control is notified or approved beforehand, Northern Ireland needs a council application before work starts, and Scotland requires a building warrant first. A completion certificate confirms sign-off at the end.

Does an RSJ need to be painted or boxed in?

Usually it needs fire protection, most often by boxing in with fire-rated plasterboard and skimming. If you want the steel on show, an intumescent paint system can be applied to the specified thickness and then top-coated in your chosen colour. The fabrication primer is not fire protection on its own.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.