Steel BeamInstallers
Steel beam half boxed in pink fire-rated plasterboard

Fire protection for steel beams · Hitchin

Fire protection for steel beams in Hitchin

Steelwork, approvals and making good for fire protection for steel beams in Hitchin and nearby.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Hitchin

Tell us about the fire protection for steel beams job in Hitchin.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Fire protection for steel beams in Hitchin: how it works

Planning fire protection for steel beams in Hitchin? Our team covers SG4 and SG5 and the streets around them. We also work in nearby Luton, roughly 7.4 miles away. You get one written quote for the calculations, approvals, propping, steel and making good.

A bare steel beam is strong at room temperature but loses much of its load-carrying capacity once it gets hot enough in a fire. If that beam holds up a floor or the walls above, it matters to everyone in the building. Fire protection slows the rate at which the steel heats up, buying time for people to get out safely.

Things to plan for

  • Exposed steel is popular in open-plan kitchens and loft spaces. An intumescent system can take a decorative top coat in most colours, although up close the finish has a slightly textured look compared with steel painted in a factory.
  • Building control treats fire protection as part of the structural approval, not an optional extra. If unprotected steel is found at inspection, the completion certificate is normally held back until the protection is in place and has been checked.
  • Older homes sometimes have steel fitted decades ago with no protection at all, or boxed in ordinary timber and hardboard. When this turns up during other work, we can check what is there and price protection to suit today's requirements.
  • Intumescent paint looks like an ordinary coating but swells into a thick insulating char when heated. How well it performs depends on the dry film thickness, which varies with the steel section and fire period, so it is applied to a written specification.
  • Boxing is generally the lower-cost route for steel that will be hidden. Intumescent coatings cost more because of the product and the number of coats, and the price rises with the fire period and the size of the section.

From survey to sign-off in Hitchin

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

What does fire protection for steel beams cost in Hitchin?

As a guide, budget £160–£640 per beam including VAT for fire protection to a steel beam in Hitchin, based on published UK cost guides adjusted for prices in the East of England (+6%).

JobTypical guide rangeWhat it usually covers
Fire protection to a steel beam£160–£640 per beamFire-rated board boxing or an intumescent coating system as specified
Steel column or post£530–£1,590 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Plastering and making good£320–£1,270Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
Structural calculations for a beam£260–£800Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for prices in the East of England (+6%) and are rounded. How these figures are worked out.

Building rules for Hitchin

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Fire protection for steel beams near Hitchin

Local questions answered

What happens at the survey visit in Hitchin?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Do I need a party wall agreement for fire protection for steel beams in Hitchin?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Does a steel column need fire protection as well as the beam?

Usually, if the column is part of the load path. A column carrying a beam is just as important in a fire, so it normally needs the same fire resistance. Columns are often boxed with board or coated with intumescent paint, and the engineer's design and building control confirm what applies to yours.

What is intumescent paint for steel beams?

Intumescent paint is a fire-protective coating that swells when heated, forming a thick insulating layer that slows the steel heating up. It lets you leave a beam on show while still meeting fire requirements. It must be applied at a specified thickness over a compatible primer, so it goes on to a written specification rather than like ordinary paint.

Can I box in a steel beam with normal plasterboard?

Not where fire protection is required. Standard plasterboard is not designed to protect steel for a set period in a fire. Fire-rated plasterboard is used instead, fixed in the number of layers and with the fixings the system specifies, so the boxing performs as intended and passes when building control checks it.

Who approves fire protection for steel beams in Hitchin?

Structural work in Hitchin needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.