Steel BeamInstallers
Steel beam half boxed in pink fire-rated plasterboard

Fire protection for steel beams · Southampton

Fire protection for steel beams in Southampton

Steelwork, approvals and making good for fire protection for steel beams in Southampton and nearby.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Southampton and nearby

Free survey in Southampton

Tell us about the fire protection for steel beams job in Southampton.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning fire protection for steel beams in Southampton

For homes in Southampton and the SO14, SO15, SO16, SO17 and SO18 districts, we handle fire protection for steel beams from survey to sign-off. We also cover the surrounding towns and villages in Hampshire. The beam is sized by a structural engineer and inspected before it is boxed in.

We fit fire protection alongside new steelwork, and as a standalone job where steel was installed without it or building control has asked for more. That covers boxing with fire-rated plasterboard, intumescent coatings for steel left on show, and the records building control needs to see before signing the work off.

Key points for your project

  • Fire boarding should not be cut into casually later on. Downlights, cables and pipes pushed through the boxing can weaken it, so services are planned before boarding, and any openings are sealed with suitable fire-stopping materials.
  • Boxing a single beam usually takes around a day, plus skimming and drying. Intumescent coatings need each coat to dry before the next goes on, so they can take several days depending on the thickness required and the room temperature.
  • Boarding is fairly clean work, but coatings need a clean, dry and well-ventilated room at a suitable temperature. Dust from other trades can spoil the surface, so painting is normally scheduled once the messy work in that room is finished.
  • Building control treats fire protection as part of the structural approval, not an optional extra. If unprotected steel is found at inspection, the completion certificate is normally held back until the protection is in place and has been checked.
  • Boxing is generally the lower-cost route for steel that will be hidden. Intumescent coatings cost more because of the product and the number of coats, and the price rises with the fire period and the size of the section.

What happens, step by step

  1. Survey in Southampton

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to Southampton City Council, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

How much should I budget in Southampton?

As a guide, budget £170–£670 per beam including VAT for fire protection to a steel beam in Southampton, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Fire protection to a steel beam£170–£670 per beamFire-rated board boxing or an intumescent coating system as specified
Steel column or post£560–£1,680 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Plastering and making good£340–£1,340Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
RSJ supply and fit (single beam)£900–£2,800 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building rules for Southampton

Structural openings in English homes need building regulations approval before work starts. Southampton City Council can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Fire protection for steel beams near Southampton

Fire protection for steel beams in Southampton: your questions

Can I stay at home while the work is done in Southampton?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Can you work on older or listed homes in Southampton?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

How thick does intumescent paint need to be on a steel beam?

There is no single figure. The thickness depends on the steel section, how many sides are exposed and the fire period required, and the coating manufacturer's data sets the dry film thickness for each case. The applied thickness is measured with a gauge once the coats have dried and recorded for building control.

Does a steel column need fire protection as well as the beam?

Usually, if the column is part of the load path. A column carrying a beam is just as important in a fire, so it normally needs the same fire resistance. Columns are often boxed with board or coated with intumescent paint, and the engineer's design and building control confirm what applies to yours.

Can I put downlights in a boxed-in steel beam?

Only with planning. Cutting holes in fire boarding can weaken its protection, so any lights in or near the boxing need to be designed in, using fire-rated fittings or suitable fire-stopping where the board is pierced. It is far easier to sort this out before the boxing goes up than to adapt it afterwards.

Who approves fire protection for steel beams in Southampton?

Structural work in Southampton needs a building notice or full plans application to Southampton City Council or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.