Steel BeamInstallers
Two installers seen from behind lifting a steel beam onto a padstone

RSJ installation · Southampton

RSJ installation in Southampton

Steelwork, approvals and making good for RSJ installation in Southampton and nearby.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Southampton and nearby

Free survey in Southampton

Tell us about the RSJ installation job in Southampton.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

RSJ installation in Southampton: how it works

RSJ installation in Southampton is planned around the house, not a standard kit. We also cover the surrounding towns and villages in Hampshire. We visit, measure and check what the wall carries, then arrange calculations and building control approval before any steel is ordered.

We supply and fit the steel from start to finish. That includes arranging the calculations, having the beam fabricated with the right end plates, holes and primer, getting it into the property, setting it on its bearings, and packing it so it takes the load. Building control, propping and making good sit in the same itemised quote.

What to expect

  • Heavy steels are raised with suitable lifting equipment rather than by hand alone. Manual handling is planned so nobody carries more than is safe, and the lift is coordinated so the beam goes up level onto both bearings together.
  • The engineer chooses the section type for the job. Universal beams suit most spans, universal columns are stockier and used as posts or where depth is limited, parallel flange channels fit against walls or timbers, and box sections suit slim or exposed members.
  • RSJ originally meant a rolled steel joist with tapered flanges. Most beams supplied for homes today are universal beams with parallel flanges, but the term RSJ has stuck, and builders, engineers and building control all understand what it means.
  • Padstones spread the concentrated load from each beam end into the masonry below. They may be concrete, engineering brick or a steel plate, depending on the engineer's design and the strength of the wall beneath.
  • Packing is what makes the beam work. Steel shims and dry-pack mortar fill the gap between the top flange and the structure above, so the load transfers onto the steel without the floor or wall settling down onto it.

Four stages, one team

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to Southampton City Council, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

Guide prices for RSJ installation in Southampton

As a guide, budget £900–£2,800 per beam including VAT for rSJ supply and fit (single beam) in Southampton, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
RSJ supply and fit (single beam)£900–£2,800 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Steel beam replacement£2,250–£6,150Propping, removing the failed beam, new steel on proper bearings, approval and making good
Temporary works and propping£170–£560Props, spreaders, needles and sole plates for a typical opening, installed and struck
Fire protection to a steel beam£170–£670 per beamFire-rated board boxing or an intumescent coating system as specified

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building control and neighbours in Southampton

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Southampton City Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

RSJ installation near Southampton

RSJ installation in Southampton: your questions

Do I need a party wall agreement for RSJ installation in Southampton?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Do you also work near Southampton?

Yes. We also cover nearby towns including Hythe, Totton, Eastleigh and Fareham.

What does RSJ stand for?

RSJ stands for rolled steel joist. It was the name for a hot-rolled I-shaped steel section with tapered flanges, and it is still used loosely for any steel beam in a house. Most steels fitted in homes today are universal beams, which do the same job with parallel flanges.

Do I need building regulations approval to fit an RSJ?

Yes, when the RSJ carries structural load such as a wall, floor or roof. In England and Wales building control is notified or approved beforehand, Northern Ireland needs a council application before work starts, and Scotland requires a building warrant first. A completion certificate confirms sign-off at the end.

Can you fit an RSJ to my own engineer's calculations?

Yes. We install to calculations and drawings from your engineer or architect, as long as they cover the beam, bearings and any columns or connections. If site conditions differ from what the design assumed, we check with the engineer before carrying on.

How soon can RSJ installation start in Southampton?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.