Fire protection for steel beams · Christchurch
Fire protection for steel beams in Christchurch
Fire protection for steel beams for homes in BH5, BH6, BH7, designed by a structural engineer.
- Survey, design and installation in one
- Covering BH5, BH6, BH7
- Inspected before it is covered
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Fire protection for steel beams in Christchurch: how it works
If you live in Christchurch, fire protection for steel beams can usually be planned and priced after a single survey visit. We also work in nearby Bournemouth, roughly 4.4 miles away. We cover BH5, BH6, BH7 and BH8, and we fix the price in writing once the layout and scope are agreed.
A bare steel beam is strong at room temperature but loses much of its load-carrying capacity once it gets hot enough in a fire. If that beam holds up a floor or the walls above, it matters to everyone in the building. Fire protection slows the rate at which the steel heats up, buying time for people to get out safely.
What to expect
- Older homes sometimes have steel fitted decades ago with no protection at all, or boxed in ordinary timber and hardboard. When this turns up during other work, we can check what is there and price protection to suit today's requirements.
- Boxing a single beam usually takes around a day, plus skimming and drying. Intumescent coatings need each coat to dry before the next goes on, so they can take several days depending on the thickness required and the room temperature.
- Boarding is fairly clean work, but coatings need a clean, dry and well-ventilated room at a suitable temperature. Dust from other trades can spoil the surface, so painting is normally scheduled once the messy work in that room is finished.
- Steel does not burn, but it loses stiffness and strength as it heats. Protection is there to keep the temperature of the beam down for a set period, so the floor or walls it carries stay up while people leave.
- Exposed steel is popular in open-plan kitchens and loft spaces. An intumescent system can take a decorative top coat in most colours, although up close the finish has a slightly textured look compared with steel painted in a factory.
How the job runs in Christchurch
Survey in Christchurch
We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.
Engineer's design
A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Install and sign-off
Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.
What does fire protection for steel beams cost in Christchurch?
As a guide, budget £150–£620 per beam including VAT for fire protection to a steel beam in Christchurch, based on published UK cost guides adjusted for prices in the South West (+3%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Fire protection to a steel beam | £150–£620 per beam | Fire-rated board boxing or an intumescent coating system as specified |
| Steel column or post | £520–£1,540 per column | Column supplied and fitted with base and cap plates on a pad foundation |
| Steel beam replacement | £2,050–£5,650 | Propping, removing the failed beam, new steel on proper bearings, approval and making good |
| Structural calculations for a beam | £260–£770 | Site measure or photos, beam and padstone design and calculations for building control |
Figures include our approximate regional adjustment for prices in the South West (+3%) and are rounded. How these figures are worked out.
Approvals in Christchurch
For Christchurch, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Fire protection for steel beams near Christchurch
- Bournemouth 4.4 mi
- New Milton 5.2 mi
- Poole 9.0 mi
- Totton 17.9 mi
- Hythe 18.7 mi
- Southampton 20.1 mi
Local questions answered
How soon can fire protection for steel beams start in Christchurch?
Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.
What happens at the survey visit in Christchurch?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.
Can I box in a steel beam with normal plasterboard?
Not where fire protection is required. Standard plasterboard is not designed to protect steel for a set period in a fire. Fire-rated plasterboard is used instead, fixed in the number of layers and with the fixings the system specifies, so the boxing performs as intended and passes when building control checks it.
Will building control check the fire protection on my beam?
Yes. Building control looks at fire protection as part of the structural work, normally at or before the final inspection. For boxing they may want to see the board before it is skimmed, and for coatings they may ask for the product details and thickness readings. We keep these records ready for them.
My steel beam was fitted years ago without fire protection. What should I do?
Have it looked at and protected to current requirements. Unprotected steel can raise questions when you sell, and if the original work was never approved, a regularisation application to building control may be needed in England and Wales. We can survey the steel and price both the protection and the paperwork route.
Do you also work near Christchurch?
Yes. We also cover nearby towns including Bournemouth, New Milton, Poole and Totton.