Steel BeamInstallers
Ground-floor chimney breast removed with a short steel beam carrying the breast above

Chimney breast removal · Haverfordwest

Chimney breast removal in Haverfordwest

Chimney breast removal for homes in SA61, designed by a structural engineer.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Haverfordwest and nearby

Free survey in Haverfordwest

Tell us about the chimney breast removal job in Haverfordwest.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What chimney breast removal involves in Haverfordwest

Haverfordwest has a mix of housing, and chimney breast removal needs a slightly different approach in each. We also cover the surrounding towns and villages in Pembrokeshire. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.

Chimney breasts take up a surprising amount of room, especially in the kitchens and bedrooms of older terraces and semis. Removing one is common, but it is structural work: the breast usually continues upstairs and up through the roof, and in terraces the stack is often shared with the house next door.

Worth knowing before you start

  • Some owners remove breasts in the loft to make space for a conversion while keeping the stack on the roof. That leaves the stack carried at loft level on steel or another support, which the engineer must design and building control must approve before work starts.
  • Removing a ground-floor breast with steel support typically takes two to four working days. Full-height removal including the stack and roof repair takes longer and depends on scaffolding, roofing access and the weather.
  • The price depends on how many floors the breast spans, whether the stack is kept or removed, the support method the engineer specifies, roof and scaffold work, and how much rubble needs taking away. Each is listed separately in the quote.
  • If you remove the breast in a ground-floor room but want to keep a fireplace or the breast in the bedroom above, the steel underneath must be designed for that load. Its ends need solid bearings, which may mean pockets cut into the party wall.
  • Once the breast is gone, the wall behind it is often rough, sooty or uneven. It is cleaned back, dubbed out where needed and plastered flat, and the floor where the hearth sat is filled level to meet the surrounding boards or screed.

Four stages, one team

  1. Free visit

    A short visit to Haverfordwest to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit the application or notice to Pembrokeshire County Council under the Building Regulations as they apply in Wales, before work starts.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

What does chimney breast removal cost in Haverfordwest?

As a guide, budget £1,350–£2,750 including VAT for chimney breast removal (ground floor) in Haverfordwest, based on published UK cost guides adjusted for prices in Wales (-9%).

JobTypical guide rangeWhat it usually covers
Chimney breast removal (ground floor)£1,350–£2,750Ground-floor breast removed, steel to support the breast above, building control and making good
Loft conversion steels£2,300–£5,450Supply and fit of floor and ridge steels on padstones, including lifting into the roof space
Load-bearing wall removal with steel beam£1,800–£4,550Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Plastering and making good£270–£1,090Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up

Figures include our approximate regional adjustment for prices in Wales (-9%) and are rounded. How these figures are worked out.

Building control and neighbours in Haverfordwest

Removing a load-bearing wall in Wales needs approval under the Welsh building regulations before work starts. For Haverfordwest the application goes to Pembrokeshire County Council or a registered building control approver, with the engineer's calculations, and a completion certificate follows the final inspection.

The Party Wall etc. Act 1996 applies in Wales as well as England, so a beam bearing into a shared wall needs a party structure notice at least two months before work starts. We arrange notices through a party wall surveyor.

Building rules in Wales

Chimney breast removal near Haverfordwest

Chimney breast removal in Haverfordwest: your questions

What happens at the survey visit in Haverfordwest?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Can you work on older or listed homes in Haverfordwest?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Will removing a chimney breast cause damp?

It can if the remaining flue is sealed with no airflow, because moisture and condensation get trapped inside. Fitting a vent in the remaining breast or wall and a ventilated cap on the chimney pot keeps air moving. If the stack is removed and the roof made good, the risk from the flue goes away.

Can I remove a chimney breast downstairs and keep the fireplace upstairs?

Usually, as long as the upstairs breast and its flue stay intact and are carried on a support the engineer designs for that load. Building control must approve the arrangement. If the upstairs fireplace has a gas fire, any work on it or its supply must be carried out by a Gas Safe registered engineer.

Should I remove the chimney stack as well?

It often makes sense if the breast is coming out on every floor, because then nothing is left to support. It needs scaffolding and roof repairs, and in terraces the stack is often shared, so your side may not be removable without affecting your neighbour's. The engineer and building control confirm what is possible.

How much does chimney breast removal cost in Haverfordwest?

As a guide, budget £1,350–£2,750 including VAT for chimney breast removal (ground floor) in Haverfordwest, based on published UK cost guides adjusted for prices in Wales (-9%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.