
Chimney breast removal · Pembroke Dock
Chimney breast removal in Pembroke Dock
Steelwork, approvals and making good for chimney breast removal in Pembroke Dock and nearby.
- Itemised written quote
- Beam sized by a structural engineer
- Covering Pembroke Dock and nearby
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
About our chimney breast removal service in Pembroke Dock
For homes in Pembroke Dock and the SA71, SA72 and SA73 districts, we handle chimney breast removal from survey to sign-off. We also cover the surrounding towns and villages in Pembrokeshire. The beam is sized by a structural engineer and inspected before it is boxed in.
We cover the survey visit, structural calculations from a qualified engineer, building control, party wall notices through a party wall surveyor where needed, temporary support, removal, the steelwork and making good. Whether you are taking out the ground-floor breast only or the full height, the itemised written quote shows each stage.
Key points for your project
- Removing only the ground-floor breast leaves the upper breast and stack in place, so they must be supported. Taking the breast out on every floor and removing the stack above the roof avoids that load entirely, but involves roofing work and more disruption.
- In terraces and semis the chimney stack usually serves both houses, with flues from each side rising together. You can generally only alter your own side, and the work must not weaken your neighbour's breast or flues, which is why party wall procedures often apply.
- Older fireplaces sometimes contain asbestos in flue linings, fire surrounds, hearth boards or heat-resistant panels. In buildings from before 2000, suspect materials are identified with a survey before removal so they can be handled correctly.
- If you remove the breast in a ground-floor room but want to keep a fireplace or the breast in the bedroom above, the steel underneath must be designed for that load. Its ends need solid bearings, which may mean pockets cut into the party wall.
- Some owners remove breasts in the loft to make space for a conversion while keeping the stack on the roof. That leaves the stack carried at loft level on steel or another support, which the engineer must design and building control must approve before work starts.
What happens, step by step
Look and measure
We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.
Design and price
Calculations come back from the engineer and we confirm your fixed written price, line by line.
Building control
We submit the application or notice to Pembrokeshire County Council under the Building Regulations as they apply in Wales, before work starts.
Fit, inspect, finish
The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.
Guide prices for chimney breast removal in Pembroke Dock
As a guide, budget £1,350–£2,750 including VAT for chimney breast removal (ground floor) in Pembroke Dock, based on published UK cost guides adjusted for prices in Wales (-9%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Chimney breast removal (ground floor) | £1,350–£2,750 | Ground-floor breast removed, steel to support the breast above, building control and making good |
| Structural calculations for a beam | £230–£680 | Site measure or photos, beam and padstone design and calculations for building control |
| Through-lounge knock-through | £2,300–£5,000 | Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill |
| Loft conversion steels | £2,300–£5,450 | Supply and fit of floor and ridge steels on padstones, including lifting into the roof space |
Figures include our approximate regional adjustment for prices in Wales (-9%) and are rounded. How these figures are worked out.
Building control and neighbours in Pembroke Dock
In Wales, structural alterations come under the Building Regulations 2010 as they apply in Wales. Pembrokeshire County Council handles building control for Pembroke Dock. For work started or approved from 1 July 2026, the Welsh system uses an application to building control, dutyholders appointed in writing, a commencement notice before work starts and a compliance statement at the end.
Where the steel bears into a wall shared with next door, notice must be served under the Party Wall etc. Act 1996. If your neighbour dissents, surveyors agree how the work is done before it starts.
Chimney breast removal near Pembroke Dock
- Pembroke 1.8 mi
- Milford Haven 4.4 mi
- Haverfordwest 7.5 mi
- Tenby 10.5 mi
Questions about chimney breast removal in Pembroke Dock
How much does chimney breast removal cost in Pembroke Dock?
As a guide, budget £1,350–£2,750 including VAT for chimney breast removal (ground floor) in Pembroke Dock, based on published UK cost guides adjusted for prices in Wales (-9%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.
Can you work on older or listed homes in Pembroke Dock?
Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.
What is included in a chimney breast removal quote?
The itemised written quote covers the survey, engineer's calculations, building control, any party wall notices, temporary support, the steel or other support specified, removal and waste, venting or capping, and plastering and floor making good. Scaffolding and roof work appear as separate lines where the stack is involved, and the price is fixed in writing once the scope is agreed.
Are gallows brackets allowed for chimney breast support?
Sometimes, but not always. Gallows brackets are used for lighter loads in certain situations, yet many building control bodies will not accept them where the remaining breast is heavy, sits on a party wall or carries the neighbour's flues. The structural engineer proposes a method and building control decides whether it is acceptable.
Should I remove the chimney stack as well?
It often makes sense if the breast is coming out on every floor, because then nothing is left to support. It needs scaffolding and roof repairs, and in terraces the stack is often shared, so your side may not be removable without affecting your neighbour's. The engineer and building control confirm what is possible.
Can I stay at home while the work is done in Pembroke Dock?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.