Chimney breast removal across Conwy, designed by a structural engineer and signed off by building control.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Conwy

Tell us about your chimney breast removal project in Conwy.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Chimney breast removal in Conwy: how it works

Chimney breast removal is taking out the projecting brickwork that houses the flues from fireplaces, usually to gain floor space or straighten a wall. If any of the breast or stack above stays in place, it must be carried on steel or another support the engineer designs and building control accepts, so it is never left unsupported.

Looking for chimney breast removal in Conwy? We can survey in places such as Llandudno, Colwyn Bay and Abergele and the villages around them. Our teams handle the calculations, the building control approval, the propping and the steel itself, and leave the opening ready for plastering and decoration.

Key points for your project

  • A flue still serving a gas fire, boiler or wood burner cannot be removed until that appliance is disconnected and an alternative arranged. Work on any gas appliance or pipe must, by law, be done by a Gas Safe registered engineer.
  • Older fireplaces sometimes contain asbestos in flue linings, fire surrounds, hearth boards or heat-resistant panels. In buildings from before 2000, suspect materials are identified with a survey before removal so they can be handled correctly.
  • The price depends on how many floors the breast spans, whether the stack is kept or removed, the support method the engineer specifies, roof and scaffold work, and how much rubble needs taking away. Each is listed separately in the quote.
  • Removing only the ground-floor breast leaves the upper breast and stack in place, so they must be supported. Taking the breast out on every floor and removing the stack above the roof avoids that load entirely, but involves roofing work and more disruption.
  • Some owners remove breasts in the loft to make space for a conversion while keeping the stack on the roof. That leaves the stack carried at loft level on steel or another support, which the engineer must design and building control must approve before work starts.

From survey to sign-off in Conwy

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit the application or notice to Conwy County Borough Council under the Building Regulations as they apply in Wales, before work starts.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

How much should I budget in Conwy?

As a guide, budget £1,350–£2,750 including VAT for chimney breast removal (ground floor) in Conwy, based on published UK cost guides adjusted for prices in Wales (-9%).

JobTypical guide rangeWhat it usually covers
Chimney breast removal (ground floor)£1,350–£2,750Ground-floor breast removed, steel to support the breast above, building control and making good
Through-lounge knock-through£2,300–£5,000Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill
Plastering and making good£270–£1,090Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
Party wall surveyor (agreed surveyor, per neighbour)£820–£1,820 per neighbourSchedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only)

Figures include our approximate regional adjustment for prices in Wales (-9%) and are rounded. How these figures are worked out.

Building control and neighbours in Conwy

In Wales, structural alterations come under the Building Regulations 2010 as they apply in Wales. Conwy County Borough Council handles building control for Conwy. For work started or approved from 1 July 2026, the Welsh system uses an application to building control, dutyholders appointed in writing, a commencement notice before work starts and a compliance statement at the end.

The Party Wall etc. Act 1996 applies in Wales as well as England, so a beam bearing into a shared wall needs a party structure notice at least two months before work starts. We arrange notices through a party wall surveyor.

Building rules in Wales

Chimney breast removal by town

Questions about chimney breast removal in Conwy

Can I stay at home while the work is done in Conwy?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

How much does chimney breast removal cost in Conwy?

As a guide, budget £1,350–£2,750 including VAT for chimney breast removal (ground floor) in Conwy, based on published UK cost guides adjusted for prices in Wales (-9%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

Can I remove a chimney breast on the ground floor only?

Yes, but whatever stays above must be properly supported. The structural engineer designs that support, usually a steel beam bearing onto walls that can take the load, and building control must approve it before work starts. Leaving an upper breast or stack without adequate support is dangerous and is a problem surveyors look for.

Will removing a chimney breast cause damp?

It can if the remaining flue is sealed with no airflow, because moisture and condensation get trapped inside. Fitting a vent in the remaining breast or wall and a ventilated cap on the chimney pot keeps air moving. If the stack is removed and the roof made good, the risk from the flue goes away.

Are gallows brackets allowed for chimney breast support?

Sometimes, but not always. Gallows brackets are used for lighter loads in certain situations, yet many building control bodies will not accept them where the remaining breast is heavy, sits on a party wall or carries the neighbour's flues. The structural engineer proposes a method and building control decides whether it is acceptable.

Can I remove a chimney breast downstairs and keep the fireplace upstairs?

Usually, as long as the upstairs breast and its flue stay intact and are carried on a support the engineer designs for that load. Building control must approve the arrangement. If the upstairs fireplace has a gas fire, any work on it or its supply must be carried out by a Gas Safe registered engineer.

How soon can chimney breast removal start in Conwy?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.