Steel BeamInstallers
Victorian through-lounge with a boxed beam where the dividing wall used to be

Through-lounge knock-throughs · Peckham

Through-lounge knock-throughs in Peckham

Through-lounge knock-throughs in Peckham, from free survey to completion certificate.

  • Free survey visit in Peckham
  • Engineer's calculations arranged
  • Building control handled for you

Free survey in Peckham

Tell us about the through-lounge knock-through job in Peckham.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our through-lounge knock-throughs service in Peckham

For homes in Peckham and the SE4, SE5, SE14, SE15 and SE16 districts, we handle through-lounge knock-throughs from survey to sign-off. We also cover the surrounding towns and villages in London. The beam is sized by a structural engineer and inspected before it is boxed in.

We plan the steel so the opening suits the room's proportions and keeps period features where you want them, from chimney breasts to cornicing. The survey visit, calculations from a qualified structural engineer, building control, party wall notices through a party wall surveyor where needed, propping, steel and making good are all set out in one itemised written quote.

Key points for your project

  • Victorian brickwork is usually laid in soft lime mortar and the internal walls may be only one brick thick. The engineer allows for this when designing the bearings, and padstones are often used to spread the beam's load over the weaker masonry.
  • Chimney breasts on the party wall in each room often sit close to the dividing wall. The beam may need to bear near them or avoid them, so the engineer checks how the breasts and flues relate to the new bearing before the opening width is fixed.
  • Ornate cornicing often runs around both rooms and stops at the wall being removed. Where practical, the run is extended across the opening by matching the profile, either run in place or cast, so the joined room looks original rather than patched.
  • Minor hairline cracks can appear in plaster upstairs as the structure takes up the new support. This is common after a knock-through and is usually filled at decoration stage, but wider or growing cracks should be reported so they can be checked.
  • Radiators, pipe runs and sockets on the dividing wall need relocating. Older houses sometimes have heating pipes running under the floor along the wall line, so these are traced and moved by a heating engineer before the wall comes down.

From survey to sign-off in Peckham

  1. Survey in Peckham

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

What do through-lounge knock-throughs cost in Peckham?

As a guide, budget £3,200–£7,050 including VAT for through-lounge knock-through in Peckham, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Through-lounge knock-through£3,200–£7,050Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill
Chimney breast removal (ground floor)£1,900–£3,850Ground-floor breast removed, steel to support the breast above, building control and making good
Plastering and making good£380–£1,540Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
Kitchen-diner knock-through£3,200–£7,700Internal structural wall between kitchen and dining room, steel beam, approvals and making good (kitchen fitting extra)

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Approvals in Peckham

Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Through-lounge knock-throughs near Peckham

Through-lounge knock-throughs in Peckham: your questions

Who approves through-lounge knock-throughs in Peckham?

Structural work in Peckham needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

How soon can through-lounge knock-throughs start in Peckham?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Will the ceiling crack when the wall is removed?

Some minor cracking in old lath and plaster ceilings is possible, even with careful propping, because the structure is being disturbed. We prop to spread the load and protect ceilings where we can, and any cracks are filled or repaired as part of making good. Sound plaster normally stays intact.

Is the wall between two reception rooms load-bearing?

In most period terraces and semis it is, because it carries the floor joists and the wall between the bedrooms above. Some later houses have lighter partitions in this position, so the only way to be sure is an engineer's inspection. We arrange this during the survey and design stage.

Can I keep the cornicing when the wall comes down?

Usually yes. The existing cornice in each room is protected during the work, and a matching profile can be run or cast to bridge the opening once the beam is boxed and plastered. How closely it matches depends on the original design and its condition, which we check at the survey visit.

Can I stay at home while the work is done in Peckham?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.