Through-lounge knock-throughs · Pimlico
Through-lounge knock-throughs in Pimlico
Steelwork, approvals and making good for through-lounge knock-throughs in Pimlico and nearby.
- Price fixed in writing once scope is agreed
- Building control arranged
- Temporary works and making good included
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
What through-lounge knock-throughs involve in Pimlico
Through-lounge knock-throughs in Pimlico are planned around the house, not a standard kit. Our coverage runs across London, so nearby villages are included too. We visit, measure and check what the wall carries, then arrange calculations and building control approval before any steel is ordered.
We plan the steel so the opening suits the room's proportions and keeps period features where you want them, from chimney breasts to cornicing. The survey visit, calculations from a qualified structural engineer, building control, party wall notices through a party wall surveyor where needed, propping, steel and making good are all set out in one itemised written quote.
Things to plan for
- The width of the opening, whether the beam bears into a party wall, and how much period detail has to be restored all affect the price. Lath and plaster repairs, cornice matching and floorboard work are priced as separate lines in the quote.
- If the house is listed, internal structural alterations need listed building consent as well as building regulations approval. Conservation area status does not usually affect internal work, but flats within converted period houses normally need the freeholder's consent.
- Period ceilings are often lath and plaster, which can crack or sag when the wall below is disturbed. Props are set to spread load gently, and damaged areas are repaired with lime plaster or overboarded, depending on the condition and your preference.
- In most terraced houses the wall between the front and back rooms runs across the house and carries the floor above, plus the wall between the front and back bedrooms. It is normally load-bearing, but the engineer still checks before any design is drawn up.
- The structural stage for a through-lounge typically takes three to five working days. Both reception rooms are out of use for that time, so furniture is moved out or stacked and sheeted, and the hallway is kept clear as the main walkway.
Four stages, one team
Free visit
A short visit to Pimlico to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
Guide prices for through-lounge knock-throughs in Pimlico
As a guide, budget £3,200–£7,050 including VAT for through-lounge knock-through in Pimlico, based on published UK cost guides adjusted for London prices (+28%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Through-lounge knock-through | £3,200–£7,050 | Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill |
| Kitchen-diner knock-through | £3,200–£7,700 | Internal structural wall between kitchen and dining room, steel beam, approvals and making good (kitchen fitting extra) |
| Temporary works and propping | £190–£640 | Props, spreaders, needles and sole plates for a typical opening, installed and struck |
| Load-bearing wall removal with steel beam | £2,550–£6,400 | Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good |
Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.
Building control and neighbours in Pimlico
For Pimlico, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Local questions answered
How soon can through-lounge knock-throughs start in Pimlico?
Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.
Can I stay at home while the work is done in Pimlico?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.
Will the ceiling crack when the wall is removed?
Some minor cracking in old lath and plaster ceilings is possible, even with careful propping, because the structure is being disturbed. We prop to spread the load and protect ceilings where we can, and any cracks are filled or repaired as part of making good. Sound plaster normally stays intact.
What happens to the floor where the wall was?
A strip of exposed joists, or a footing in a solid floor, is left where the wall stood. Timber floors are patched with matching or reclaimed boards, and solid floors are filled and levelled. If you are fitting a new floor across both rooms, it is simply prepared level for the new finish.
Do I need consent to knock through in a listed building?
Yes, you need both listed building consent and building regulations approval. Listed building consent from the local planning authority covers internal structural changes to the building's fabric, and building control covers the structural safety. Carrying out works to a listed building without consent is an offence, so it must be in place before anything is booked.
Do you also work near Pimlico?
Yes. We also cover nearby towns including Westminster, Battersea, Chelsea and Brixton.