Temporary works & propping · Solihull
Temporary works & propping in Solihull
Temporary works & propping for homes in B90, B91, B92, designed by a structural engineer.
- Price fixed in writing once scope is agreed
- Building control arranged
- Temporary works and making good included
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Planning temporary works & propping in Solihull
Planning temporary works & propping in Solihull? Our team covers B90, B91, B92 and B93 and the streets around them. It sits about 6.8 miles from Birmingham, which we also cover. You get one written quote for the calculations, approvals, propping, steel and making good.
Propping is included in every structural job we quote, and we can also provide it as a separate service where a wall, lintel or chimney needs supporting while other work goes on. The layout of props, needles and spreaders follows the engineer's calculations or a temporary works design for the job.
Key points for your project
- In older homes with lime mortar and soft bricks, the masonry above an opening can loosen once it is cut. The engineer may call for closer needle spacing or fuller support, because old walls can arch or drop in ways a modern wall does not.
- On larger jobs, a temporary works register or permit records when the props were installed, inspected, loaded and removed. It creates a clear trail showing each stage was checked before the next one began.
- Propping costs depend on how many props and needles the load calls for, how long they stay in, whether a separate temporary works design is required, and whether props must continue through a floor to reach solid ground.
- For simple openings, the engineer's calculations usually show the propping arrangement. Larger or unusual jobs, such as removing several walls or working beneath chimney stacks, may need a separate temporary works design prepared by an engineer.
- Typical mistakes include props standing on unsupported floorboards, missing spreaders so one joist takes all the load, and props wound up too hard so the ceiling lifts and cracks. Careful setting out and gradual tightening avoid all three.
What happens, step by step
Free visit
A short visit to Solihull to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to Solihull Council, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
What do temporary works & propping cost in Solihull?
As a guide, budget £150–£500 including VAT for temporary works and propping in Solihull, based on published UK cost guides adjusted for prices in the West Midlands (no adjustment).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Temporary works and propping | £150–£500 | Props, spreaders, needles and sole plates for a typical opening, installed and struck |
| Lintel replacement | £400–£1,200 per lintel | Propping, removing the old lintel, new lintel set on beds and brickwork made good |
| RSJ supply and fit (single beam) | £800–£2,500 per beam | Beam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately) |
| Chimney breast removal (ground floor) | £1,500–£3,000 | Ground-floor breast removed, steel to support the breast above, building control and making good |
Figures include our approximate regional adjustment for prices in the West Midlands (no adjustment) and are rounded. How these figures are worked out.
Approvals in Solihull
For Solihull, building control is provided by Solihull Council, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Temporary works & propping near Solihull
- Shirley 1.6 mi
- Acocks Green 2.9 mi
- Birmingham 6.8 mi
- Aston 7.3 mi
- Bartley Green 9.2 mi
- Kenilworth 9.5 mi
Temporary works & propping in Solihull: your questions
Do I need a party wall agreement for temporary works & propping in Solihull?
Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.
Do you cover Solihull for temporary works & propping?
Yes. We carry out temporary works & propping in Solihull and the B90, B91, B92 and B93 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.
Does temporary propping need building control approval?
Not on its own, but the structural work it supports usually does. Removing a load-bearing wall or inserting a beam needs building regulations approval in England, Wales and Northern Ireland, and a building warrant in Scotland. The propping arrangement normally forms part of the engineer's calculations sent with that application.
How many props do I need to take out a load-bearing wall?
It depends on the span, the weight above and the strength of the floor the props stand on. The engineer's calculations or a temporary works design set the number and spacing. It is not something to guess, because too few props, or props in the wrong place, can let the structure move.
What is needling a wall?
Needling means cutting holes through a wall just above where an opening will go and passing short steel beams, called needles, through them. Each needle is supported on props on both sides, so the masonry above rests on the needles while the wall below is removed and the permanent beam is fitted.