Steel BeamInstallers
Adjustable steel props and needles supporting a brick wall before an opening is formed

Temporary works & propping · Porthmadog

Temporary works & propping in Porthmadog

Steelwork, approvals and making good for temporary works & propping in Porthmadog and nearby.

  • Free survey visit in Porthmadog
  • Engineer's calculations arranged
  • Building control handled for you

Free survey in Porthmadog

Tell us about the temporary works & propping job in Porthmadog.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning temporary works & propping in Porthmadog

Our temporary works & propping service in Porthmadog covers everything from the first visit to the completion paperwork. We also cover the surrounding towns and villages in Gwynedd. Postcode districts we cover here include LL47, LL48 and LL49.

The moment a load-bearing wall is cut, whatever it was holding needs another route to the ground. Temporary works provide that route. Done well, nothing above moves, ceilings stay intact and the floor below is not overloaded. Done badly, it is where structural work goes wrong.

Worth knowing before you start

  • Adjustable steel props are the workhorse, with timber spreaders on top to share the load across several joists. Steel needles pass through the wall to carry masonry above an opening, and prop head attachments known as masonry support heads support brickwork without needles.
  • Props and needles cannot go where pipes, cables or flues run. Their positions are checked against services before any holes are cut, and anything in the way is isolated or rerouted first by the appropriate trade.
  • The order of work matters. Props go in and are tightened before any masonry is cut, the opening is formed in stages, and the props stay until the permanent steel is packed tight and the bedding mortar has gained enough strength.
  • In the UK, temporary works are generally managed following BS 5975, the code of practice for temporary works procedures. On bigger jobs that means a named coordinator, a written design and checks before props are loaded or taken out.
  • Propping costs depend on how many props and needles the load calls for, how long they stay in, whether a separate temporary works design is required, and whether props must continue through a floor to reach solid ground.

What happens, step by step

  1. Survey in Porthmadog

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit the application or notice to Cyngor Gwynedd under the Building Regulations as they apply in Wales, before work starts.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

How much should I budget in Porthmadog?

As a guide, budget £140–£460 including VAT for temporary works and propping in Porthmadog, based on published UK cost guides adjusted for prices in Wales (-9%).

JobTypical guide rangeWhat it usually covers
Temporary works and propping£140–£460Props, spreaders, needles and sole plates for a typical opening, installed and struck
Load-bearing wall removal with steel beam£1,800–£4,550Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
RSJ supply and fit (single beam)£730–£2,280 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Lintel replacement£360–£1,090 per lintelPropping, removing the old lintel, new lintel set on beds and brickwork made good

Figures include our approximate regional adjustment for prices in Wales (-9%) and are rounded. How these figures are worked out.

Building control and neighbours in Porthmadog

Removing a load-bearing wall in Wales needs approval under the Welsh building regulations before work starts. For Porthmadog the application goes to Cyngor Gwynedd or a registered building control approver, with the engineer's calculations, and a completion certificate follows the final inspection.

The Party Wall etc. Act 1996 applies in Wales as well as England, so a beam bearing into a shared wall needs a party structure notice at least two months before work starts. We arrange notices through a party wall surveyor.

Building rules in Wales

Temporary works & propping near Porthmadog

Questions about temporary works & propping in Porthmadog

How much do temporary works & propping cost in Porthmadog?

As a guide, budget £140–£460 including VAT for temporary works and propping in Porthmadog, based on published UK cost guides adjusted for prices in Wales (-9%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

Who approves temporary works & propping in Porthmadog?

Structural work in Porthmadog needs a building control application to Cyngor Gwynedd under the Welsh regulations, with a commencement notice before work starts. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

How many props do I need to take out a load-bearing wall?

It depends on the span, the weight above and the strength of the floor the props stand on. The engineer's calculations or a temporary works design set the number and spacing. It is not something to guess, because too few props, or props in the wrong place, can let the structure move.

How long do props have to stay in after a beam is fitted?

Until the permanent steel is packed tight and able to carry the load. That includes time for the padstone and packing mortar to gain enough strength, which depends on the mix and the weather. On a typical opening, props are in for a few days before being released gradually.

Why do you need props to remove a wall?

Because the wall is holding up weight that still has to be supported while it is gone. Props and needles carry the floors, walls or roof above down to the ground until the new steel beam is fitted, packed and taking the load. Without them, the structure above could drop, crack or, at worst, collapse.

What happens at the survey visit in Porthmadog?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.