Steel BeamInstallers
Adjustable steel props and needles supporting a brick wall before an opening is formed

Temporary works & propping · Wigan

Temporary works & propping in Wigan

Temporary works & propping in Wigan, from free survey to completion certificate.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Wigan

Tell us about the temporary works & propping job in Wigan.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning temporary works & propping in Wigan

Wigan has a mix of housing, and temporary works & propping need a slightly different approach in each. Our coverage runs across Greater Manchester, so nearby villages are included too. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.

The moment a load-bearing wall is cut, whatever it was holding needs another route to the ground. Temporary works provide that route. Done well, nothing above moves, ceilings stay intact and the floor below is not overloaded. Done badly, it is where structural work goes wrong.

Worth knowing before you start

  • Props take up floor space for the length of the job, usually in the rooms on both sides of the wall. Furniture needs moving back, and nobody else in the house should knock, adjust or hang anything from the props.
  • In older homes with lime mortar and soft bricks, the masonry above an opening can loosen once it is cut. The engineer may call for closer needle spacing or fuller support, because old walls can arch or drop in ways a modern wall does not.
  • Adjustable steel props are the workhorse, with timber spreaders on top to share the load across several joists. Steel needles pass through the wall to carry masonry above an opening, and prop head attachments known as masonry support heads support brickwork without needles.
  • Every prop delivers a concentrated load that has to go somewhere. Before any are set up, the floor beneath is checked, because a suspended timber floor or a thin slab may not take that load without extra support carried down to the ground.
  • On larger jobs, a temporary works register or permit records when the props were installed, inspected, loaded and removed. It creates a clear trail showing each stage was checked before the next one began.

What happens, step by step

  1. Survey in Wigan

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to Wigan Council, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

What do temporary works & propping cost in Wigan?

As a guide, budget £140–£480 including VAT for temporary works and propping in Wigan, based on published UK cost guides adjusted for prices in the North West (-4%).

JobTypical guide rangeWhat it usually covers
Temporary works and propping£140–£480Props, spreaders, needles and sole plates for a typical opening, installed and struck
Party wall surveyor (agreed surveyor, per neighbour)£860–£1,920 per neighbourSchedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only)
Structural calculations for a beam£240–£720Site measure or photos, beam and padstone design and calculations for building control
RSJ supply and fit (single beam)£770–£2,400 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)

Figures include our approximate regional adjustment for prices in the North West (-4%) and are rounded. How these figures are worked out.

Building control and neighbours in Wigan

Structural openings in English homes need building regulations approval before work starts. Wigan Council can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Temporary works & propping near Wigan

Temporary works & propping in Wigan: your questions

Do I need a party wall agreement for temporary works & propping in Wigan?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

How much do temporary works & propping cost in Wigan?

As a guide, budget £140–£480 including VAT for temporary works and propping in Wigan, based on published UK cost guides adjusted for prices in the North West (-4%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

How long do props have to stay in after a beam is fitted?

Until the permanent steel is packed tight and able to carry the load. That includes time for the padstone and packing mortar to gain enough strength, which depends on the mix and the weather. On a typical opening, props are in for a few days before being released gradually.

Does temporary propping need building control approval?

Not on its own, but the structural work it supports usually does. Removing a load-bearing wall or inserting a beam needs building regulations approval in England, Wales and Northern Ireland, and a building warrant in Scotland. The propping arrangement normally forms part of the engineer's calculations sent with that application.

Can I stay in my house while it is propped?

Usually, yes. The props take up space in the rooms either side of the work, so those rooms will be out of use, but the rest of the house can be lived in as normal. The props must never be moved, knocked or adjusted by anyone other than the installation team.

Planning to take a wall out?