Temporary works & propping · Gelligaer
Temporary works & propping in Gelligaer
Temporary works & propping for homes in CF81, CF82, NP12, designed by a structural engineer.
- Survey, design and installation in one
- Covering CF81, CF82, NP12
- Inspected before it is covered
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
About our temporary works & propping service in Gelligaer
Gelligaer has a mix of housing, and temporary works & propping need a slightly different approach in each. We also cover the surrounding towns and villages in Caerphilly. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.
The moment a load-bearing wall is cut, whatever it was holding needs another route to the ground. Temporary works provide that route. Done well, nothing above moves, ceilings stay intact and the floor below is not overloaded. Done badly, it is where structural work goes wrong.
Things to plan for
- On larger jobs, a temporary works register or permit records when the props were installed, inspected, loaded and removed. It creates a clear trail showing each stage was checked before the next one began.
- For simple openings, the engineer's calculations usually show the propping arrangement. Larger or unusual jobs, such as removing several walls or working beneath chimney stacks, may need a separate temporary works design prepared by an engineer.
- Props take up floor space for the length of the job, usually in the rooms on both sides of the wall. Furniture needs moving back, and nobody else in the house should knock, adjust or hang anything from the props.
- When an external wall is propped, the opening is sheeted against rain and the house is kept secure overnight. Where props stand outside, ground conditions, drains and access paths are taken into account before they are set up.
- In the UK, temporary works are generally managed following BS 5975, the code of practice for temporary works procedures. On bigger jobs that means a named coordinator, a written design and checks before props are loaded or taken out.
What happens, step by step
Free visit
A short visit to Gelligaer to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit the application or notice to Caerphilly County Borough Council under the Building Regulations as they apply in Wales, before work starts.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
How much should I budget in Gelligaer?
As a guide, budget £140–£460 including VAT for temporary works and propping in Gelligaer, based on published UK cost guides adjusted for prices in Wales (-9%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Temporary works and propping | £140–£460 | Props, spreaders, needles and sole plates for a typical opening, installed and struck |
| Structural calculations for a beam | £230–£680 | Site measure or photos, beam and padstone design and calculations for building control |
| Load-bearing wall removal with steel beam | £1,800–£4,550 | Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good |
| Chimney breast removal (ground floor) | £1,350–£2,750 | Ground-floor breast removed, steel to support the breast above, building control and making good |
Figures include our approximate regional adjustment for prices in Wales (-9%) and are rounded. How these figures are worked out.
Approvals in Gelligaer
In Wales, structural alterations come under the Building Regulations 2010 as they apply in Wales. Caerphilly County Borough Council handles building control for Gelligaer. For work started or approved from 1 July 2026, the Welsh system uses an application to building control, dutyholders appointed in writing, a commencement notice before work starts and a compliance statement at the end.
Where the steel bears into a wall shared with next door, notice must be served under the Party Wall etc. Act 1996. If your neighbour dissents, surveyors agree how the work is done before it starts.
Temporary works & propping in Gelligaer: your questions
Can you work on older or listed homes in Gelligaer?
Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.
Can I stay at home while the work is done in Gelligaer?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.
Do I need a temporary works design for my job?
Not always. For a simple single opening, the propping shown in the engineer's calculations is often enough. Bigger or more complex jobs, such as removing several walls, supporting chimney stacks or replacing a shopfront beam, may need a separate temporary works design from an engineer, following the BS 5975 approach.
How many props do I need to take out a load-bearing wall?
It depends on the span, the weight above and the strength of the floor the props stand on. The engineer's calculations or a temporary works design set the number and spacing. It is not something to guess, because too few props, or props in the wrong place, can let the structure move.
Can props damage my floor?
They can if they are set up carelessly. Each prop concentrates load on a small area, so sole plates or boards are used to spread it, and on suspended timber floors props may be carried through to the ground below. Floor coverings are protected with boards and sheeting before any prop goes in.